See how AI-powered progress tracking helps data center teams identify schedule risks earlier and build with confidence.
Doxel is heading to Singapore for Data Centre World Asia 2026, taking place September 29–30 at the Sands Expo & Convention Centre as part of Singapore Technology Week. As an LED Wall Sponsor, Doxel will showcase how AI-powered Work-in-Place (WIP) tracking and schedule analytics help project teams identify schedule risks earlier, improve coordination, and make faster decisions throughout construction. Come visit us at booth 3G2.
Southeast Asia's data center pipeline has moved fast over the past two years. Singapore is a central hub for hyperscalers, colocation providers, and contractors racing to deliver capacity across a region where power, land, and skilled labor are tighter constraints than in more established markets.
That pressure shows up on the jobsite. Compressed schedules, fragmented regional supply chains, and delivery models that vary market to market all make it harder to know, with any confidence, where a project actually stands. Teams are still leaning on manual walk-throughs and self-reported updates to answer a basic question: is the work installed, and is it on pace with the plan?
Data Centre World Asia brings the people wrestling with that question into one room — five concurrent tracks covering the Global Stage, Keynote Theatre, Energy Security & Efficiency, Critical Infrastructure, and OCP Tech Day. It's a good cross-section of where APAC data center construction is headed, and exactly the audience we built Doxel for.
Doxel turns weekly site walks into objective, component-level progress data, tracking installed work against the plan, flagging schedule risk early, and giving owners, GCs, and trade partners a shared, factual view of where a project stands. No more disputes over whose version of “done” is right.
Teams using Doxel get:
• Automated progress tracking tied directly to the schedule
• Earlier visibility into delays, before they become critical-path problems
• A single source of truth that keeps owners, GCs, and trades aligned
• Benchmarking across projects to spot where production is slipping
For a region building as many facilities, as fast as APAC is right now, that kind of visibility isn't a nice-to-have; it's what keeps a portfolio of projects on schedule.
Doxel's team will be at booth 3G2 throughout the show: Spencer Clayton, Dom Pound-Palmieri, Jesse Gill, Hamza Abukar, and Sridhar Rengasamy, our APAC Lead. Sridhar has spent years working on large-scale infrastructure projects across Southeast Asia and is happy to share his expertise on the region.
If you're attending Data Centre World Asia and want to talk about a live or upcoming project, stop by booth 3G2 or reach out to Sridhar on LinkedIn to set up time.
We'll see you in Singapore.


LCI Congress 2026 is the place to be to see how AI-powered progress tracking gives Lean construction teams objective visibility into project progress, helping improve planning, coordination, and delivery.
Doxel is excited to return as a sponsor of LCI Congress 2026, where owners, contractors, designers, and Lean practitioners will explore the strategies and technologies shaping the future of project delivery. Taking place October 12-16, 2026, in Atlanta, Georgia, LCI Congress brings together construction leaders focused on improving collaboration, reliability, and continuous improvement.
Date: Thursday, October 15, 2026, 3:45-4:30 PM

Panelists:
- Moderator - Chris Vine, LCI-CPC, DBIA, CM-Lean Champion, Project Superintendent, Hensel Phelps
- Speaker - Brandon Bergener, Sr. Superintendent, Layton Construction Company LLC
- Speaker - John Rewolinski, Head of Schedule Analytics, Doxel
Lean construction depends on accurate, timely information. Yet many teams still rely on manual jobsite walks and spreadsheets to understand project status.
Doxel's AI-powered Work-in-Place (WIP) tracking gives Lean teams objective, real-time visibility into construction progress, helping project teams compare plan versus actual performance, improve coordination, and identify schedule risks earlier.
Whether supporting Last Planner System®, Takt planning, or flow reliability, Doxel provides trusted progress intelligence that helps teams make faster, more informed decisions.
Stop by Booth #113 to learn how leading construction teams are using AI-powered progress tracking to:
We're also proud to sponsor the LCI Congress Golf Tournament, including Hole #6 and the TaylorMade Golf Kit giveaway.
LCI Congress 2026 | October 12-16, 2026
Signia by Hilton | Atlanta, Georgia
Visit Booth #113 to how AI-powered progress tracking is helping teams deliver projects with greater certainty, consistency, and confidence.

The conference brings together leaders focused on solving the biggest challenges in AI infrastructure, including prefabrication, digital construction, power availability, and accelerated project delivery.
Doxel is heading to the Builtworlds Buildings Conference: Data Centers & AI Infrastructure to demonstrate how AI-powered progress tracking helps owners and contractors reduce schedule risk and accelerate data center delivery.
AI infrastructure projects are growing larger, faster, and more complex, making objective progress visibility more important than ever.
The event takes place September 30 to October 1 in Nashville, Tennessee. As a Premier Sponsor, Doxel will showcase how AI-powered Work-in-Place (WIP) tracking and schedule analytics help project teams identify schedule risks earlier, improve coordination, and make faster decisions throughout construction.
Thursday, October 1 | 2:10 PM – 2:50 PM

Speakers
What is reality on your jobsite? Your P6 says one thing, your trade partners say another. On a hyperscale data center, having near real-time, objective progress data helps you make better decisions to stay on schedule. In this session, a DPR superintendent and Doxel product leader share real stories from the field: catching a piping trade's slide months before it became a crisis, discovering security rough-ins installed three feet off design, and proving drywall was way ahead of schedule to a skeptical client with a single click.
Join Reid Senescu and Mike Miller as they share how computer vision turns weekly 360° site walks into objective, component-level progress data that keeps trades on plan, settles disputes with evidence instead of arguments, and drives the coordination conversations that build data centers faster. You'll leave with practical adoption lessons—including why a dashboard on the wall beats a hyperlink in an inbox every time.
This year's conference focuses on the challenges shaping modern AI infrastructure, including prefabrication, digital construction, power availability, and project delivery. These priorities align closely with Doxel's AI-powered Work-in-Place (WIP) tracking and schedule analytics, giving project teams objective insight into progress so they can reduce risk and make faster decisions.
Visit Doxel during the conference to learn how leading data center teams are using AI to:
We look forward to connecting with owners, contractors, and technology leaders at BuiltWorlds to discuss how AI-powered progress tracking is helping deliver the next generation of data centers with greater certainty.
When the scan says "not installed," and the trade says "we did it," the answer might be a quality problem, not a data error
▶ WATCH THE FULL PRESENTATION
Computer Vision Is the Andon Cord Construction Has Always Needed
LCI Conference 2025 · Reid Senescu, Doxel & Mike Miller, DPR Construction
Doxel's system was designed to track progress, but on a hyperscale data center project with DPR Construction, it caught something that no daily report, RFI, or schedule update had flagged, and the lesson that came out of it changed how the team interpreted data discrepancies entirely.
The story starts with a flag. Doxel's AI detected uninstalled security components near certain doors. The electrical trade partner pushed back hard, claiming they had roughed in all the security to those doors. In their estimation, the work was done.
After further investigation, the team found the truth: the security boxes had been installed. Three feet to the right of where they were supposed to be.

The components had been physically installed, but they were mislocated relative to the BIM. When comparing the 360° site photos against the model, Doxel’s AI correctly identified them as not installed in the designated location.
"If something's showing as not installed and the trade partner says it's installed, we probably have a quality control problem. Not the intended use case — but awesome to see."
— Mike Miller, Superintendent, DPR Construction
The team had stumbled onto a new interpretive principle. When Doxel flags something as missing and the trade says it's done, don't default to assuming the data is wrong. Investigate. The discrepancy might not be a tracking error; it might be a quality flag.
Mike was direct about what happened next and what it cost. Rework followed. But by investigating when they did, the team headed off even higher costs than if the issue had been found later.
REWORK WARNING: Dismissing data because it contradicts expectation is how quality issues get buried. The cost of investigation is almost always lower than the cost of rework — especially once walls are closed.
This is not an abstract lean principle. It played out on a real job, on real infrastructure, with real rework costs. The lesson is practical: when scan data and field reports disagree, treat the disagreement as information, not noise.
Construction quality management has traditionally relied on scheduled inspections, trade self-reporting, and periodic walkthroughs. These methods work reasonably well for obvious defects. They are poor at catching components that are physically present, but are installed in the wrong place relative to the design.
Computer vision can fill this gap by comparing what is physically present against the BIM at the component level across all visible trades every week. Mislocations look identical to missing components from the system's perspective, because in both cases, the component is not where it should be.
The practical recommendation from Mike's experience is to establish a protocol for investigating discrepancies rather than defaulting to dismissal. When a trade reports complete and the system reports incomplete, send someone to review the discrepancy. It only takes minutes, but it can prevent weeks of rework.
There is a secondary benefit this story highlights: objective, time-stamped documentation of installation location for every component. On a complex facility like a data center, where systems are dense, and modifications may be needed years later, having a record of where things were actually installed, not just where they were designed to go, has ongoing operational value.
This use case wasn't in the sales deck. It emerged from a real disagreement on a real job. That's often how the most durable capabilities get discovered.
Doxel is proving that transforming an industry starts with the people behind it.
Doxel has been recognized by Forbes as one of America’s Best Startup Employers, highlighting the company’s rapid growth, strong culture, and commitment to developing talent in construction technology.

The annual Forbes ranking evaluates thousands of startup companies across the United States based on employer reputation, employee satisfaction, and growth. The recognition reflects the impact Doxel has built not only in transforming construction productivity but also in creating a workplace where employees can build meaningful careers.
You can see the full list here.
Doxel develops AI-powered construction progress tracking technology that helps owners and contractors deliver projects faster and with greater certainty. By automatically capturing jobsite data and comparing it to BIM models and project schedules, the platform provides objective visibility into construction progress and productivity.
The system helps teams eliminate manual reporting, gain objective insights, and make faster decisions across complex construction projects.
For Saurabh Ladha, CEO and Founder of Doxel, the Forbes recognition reflects years of commitment to both innovation and people.
“Our mission has always been to transform how the world builds. That requires not only great technology, but great people. Being recognized by Forbes as one of America’s Best Startup Employers is a testament to the incredible team we have built at Doxel.” - Saurabh Ladha, CEO and Founder of Doxel
Ladha added that solving construction’s productivity challenges requires long-term thinking and strong collaboration across engineering, product, and customer success teams.

Employee satisfaction has played a major role in Doxel’s recognition.
The company currently maintains a Glassdoor rating of approximately 4.1 out of 5, reflecting strong employee feedback on leadership, culture, and career opportunities.
Many employees highlight the opportunity to grow quickly within the organization and take on new responsibilities as the company scales.
“If you’re looking for a fast-growing company that genuinely supports career progression, values its people, and maintains a strong culture as it scales, Doxel is a great place to be,” said one account team member.
Another employee noted that Doxel’s leadership actively supports internal promotions and professional development.
“The career advancement opportunity has been great! I've been given several opportunities to be promoted to higher leadership roles over the past few years.”
Construction remains one of the world’s largest industries, yet productivity has stagnated for decades. According to research from McKinsey, construction productivity grew only 0.4% annually between 2000 and 2022, far behind gains in manufacturing and the broader economy.
Doxel’s technology addresses this challenge by providing automated, objective progress tracking across construction sites. The platform scans projects, compares actual progress against plans, and helps teams identify schedule risks earlier.
Companies using Doxel gain:
These insights allow project teams to make faster decisions and keep complex projects on track.
For Doxel employees across engineering, AI research, and customer success, the opportunity to solve real problems in construction has become a major motivator.
“We’re not just building software,” said Reid Senescu, Sr. Vice President of Product, Marketing, and Customer Success. “We’re helping an industry that builds hospitals, data centers, and infrastructure deliver projects faster and with more certainty.”
That mission has helped Doxel attract talent from both technology and construction backgrounds, creating a team with deep expertise across AI, robotics, and capital project delivery.
The Forbes recognition highlights Doxel’s momentum as the company continues expanding its technology platform and customer base across major global construction projects.
For Ladha, the award reflects the culture the company intends to preserve as it grows.
“Our goal is to build a company where talented people can do the best work of their careers while solving meaningful challenges for the construction industry.”
- Saurabh Ladha, CEO and Founder of Doxel

How AI progress tracking gives superintendents a signal weeks before a delay becomes a crisis
LCI Conference 2025 · Reid Senescu, Doxel & Mike Miller, DPR Construction
Every superintendent knows the feeling: a trade partner reports they're on track, the schedule says green, and then, one week before a milestone, the reality hits. The work isn't there. The cascade starts. The conversations get harder.
The problem isn't that anyone is lying. The problem is that construction progress has always been measured the same way: someone walks around, someone asks, someone estimates. By the time a deviation surfaces through normal reporting channels, weeks have passed, and the cost of recovering has multiplied.
Data-driven construction executives are disciplined in leveraging technology and processes to capture crucial information about their projects. At LCI Conference 2025, DPR Project Executive Mike Miller described how automated progress tracking changed that dynamic on his hyperscale data center project, starting with a piping trade partner whose slip he could see forming in real time.
Starting in December, Doxel's computer vision system began showing a divergence between the piping trade's actual installed quantities and their planned schedule. Not a dramatic gap at first. Just a signal.
Under traditional reporting, that gap might not have surfaced until a formal schedule update meeting or until it cascaded into delayed downstream trades. With automated tracking, Mike could see it forming week by week, grounded in automated progress tracking rather than self-reporting.
"As a leader, you only have so much time to focus on certain things. I can't focus on everything all the time. I can see who's on plan and I can focus where we have the risk."— Mike Miller, Project Executive, DPR Construction
What followed was a textbook plan-do-check-act (PDCA) loop. The trade was brought to the table. The data was shared. Initially, there was resistance — new tools, new data, trust takes time. But by year-end, the team accepted the picture and decided to add resources. Check the result. Adjust again if needed.
Mike called it "bread and butter." The system is working exactly as it should.

KEY INSIGHT Early detection gives leadership the visibility to have the right conversation at the right time.
The lean parallel is direct. In manufacturing, the Andon cord's value isn't the cord itself; it's the organizational culture that responds to it. Doxel's computer vision functions as a continuous Andon cord across the entire job site, flagging deviations the moment they're detectable, not weeks later when they've compounded.
Reid Senescu, Head of Product at Doxel, described the underlying principle: construction sites have historically lacked the sensor layer that lean manufacturing has always relied on. No factory would operate without real-time feedback on production output. Yet construction, which is far more complex and expensive, has run primarily on estimates and walking the site.
The system takes three inputs:
Computer vision compares the scan against the BIM to determine what has been physically installed at the component level across all trades and at every stage of construction. A large language model ties the schedule to the BIM, producing a real-time 4D view of the actual project state versus the planned state.
The result: trade and project-level progress data grounded in physical observation rather than self-reporting, updated at least weekly, with no additional engineering work required for onboarding.
Doxel has captured over 3 billion square feet of construction. That dataset powers the "rules of credit" — weighted effort models that let the system aggregate component-level data up to an accurate project percent complete.
What This Means for Owners and GCs
For owners, the implication of this story is straightforward: the capability exists to monitor capital investments in construction with the same rigor applied to financial data, inventory, or operational metrics. Requiring automated progress tracking in the RFP: specifying that it must cover all visible trades and at least 80 stages of construction is the most direct way to ensure this capability is on every project.
For GCs like DPR, the story is about competitive differentiation. The teams that build trust in objective data and act on it early catch problems before they cascade. They spend less on rework and recover faster.
The Andon cord is finally available for job sites. The question is how quickly the team can respond when it sounds.
Lean isn’t just a principle — it’s how Doxel is pushing the industry forward. That’s why we’re excited to join the 2025 LCI Congress in Arlington, Texas.
Doxel is proud to sponsor the 27th Annual LCI Congress in Arlington, TX, October 20–24, 2025. Visit Booth #214 to see how we help teams pioneer Lean progress with real-time, AI-powered insights.
📅 October 20–24, 2025
📍 Arlington, Texas
📍 Doxel Booth #214
🔗 Join us at LCI Congress
The Lean Construction Institute (LCI) is celebrating its 27th Annual Congress in Arlington, Texas, bringing together leaders from across the AEC industry for a week of education, networking, and Lean discovery. This event is recognized as the premier gathering for advancing Lean design and construction practices, where owners, designers, trade partners, and contractors come together to share knowledge and transform the way projects are delivered.
With the theme of pioneering progress through education, networking, and Lean discovery, LCI Congress offers attendees the opportunity to:
At Doxel, we believe Lean principles are more than a framework—they are the foundation for building certainty into every project. Our AI-powered progress tracking platform provides the objective, real-time insights teams need to eliminate waste, optimize resources, and stay ahead of schedule.
By combining computer vision with automated benchmarking, Doxel helps owners and builders align field reality with Lean schedules, creating a living plan that adjusts based on actual progress. This empowers teams to:
We are proud to sponsor LCI Congress 2025 and showcase how our platform helps advance Lean construction practices. If you’re attending, visit us at Booth #214 to see how Doxel enables real-time observability and creates confidence in delivering projects faster and more reliably.

Learn more about the event and register here: LCI Congress 2025

Meet Doxel at Procore Groundbreak 2025 in Houston, Oct 14–16. See how AI-powered insights drive faster, more predictable project delivery. Booth 233.
Groundbreak brings together global leaders and industry experts who are setting a new standard for construction. This October, join Doxel in Houston, TX for Procore Groundbreak 2025 as we connect with innovators, problem-solvers, and visionaries driving our industry forward with cutting-edge solutions and breakthrough technologies.
📅 October 14–16, 2025
📍 Houston, TX
🟨 Visit Doxel at Booth 233
Procore Groundbreak has become the go-to event for forward-thinking builders, owners, and technology partners. Attendees gain direct access to:
This is where the conversations that define construction’s future are happening.
Doxel helps owners, general contractors, and trade partners gain certainty in complex projects with tools that fit the way each role works.
By stopping at our booth, you’ll see how Doxel empowers every stakeholder—from the boardroom to the jobsite—to deliver projects faster, safer, and with greater confidence.
Don’t miss your chance to see the technologies shaping tomorrow. Visit Doxel at Booth 233 at Groundbreak 2025. We look forward to building the future together in Houston.
Join Doxel at DCAC Austin 2025 to explore the dawn of the data center gold rush and how AI-powered progress tracking helps deliver certainty at speed and scale.
Austin, Texas | September 16–18, 2025 | Hyatt Place Austin Downtown
The data center market is entering a new era of unprecedented demand, and nowhere is that more evident than at DCAC Austin 2025. Known as one of the most forward-looking data center conferences in the U.S., DCAC brings together visionaries, builders, and operators to explore how this gold rush moment is reshaping the digital economy.
This year’s theme, “The Dawn of the Data Center Gold Rush,” highlights the wave of new opportunities driven by AI, hyperscale growth, and global infrastructure investment. Developers, contractors, and owners are under pressure to deliver projects at speed and scale while navigating power, land, and supply chain constraints.
Austin and the broader Central Texas region are witnessing explosive growth in data center development:
As a sponsor of DCAC Austin 2025, Doxel is proud to support the industry at this pivotal moment. Our AI-powered progress tracking platform provides owners and contractors with real-time visibility into construction performance, helping teams avoid delays, manage costs, and deliver certainty when it matters most.
In a gold‑rush environment where land, labor, and timelines are stretched thin, Doxel helps building teams deliver on time.
We’re excited to connect with owners, developers, and general contractors at DCAC Austin 2025. This is your chance to see firsthand how technology and innovation are redefining data center construction.
📍 Event: DCAC Austin 2025
📅 Date: September 16–18, 2025
📍 Location: Hyatt Place Austin Downtown
Whether you’re exploring new projects or scaling delivery capacity, Doxel is here to help you capture the opportunities of this historic moment for the data center industry.
Learn more about the event and register here.
Doxel now supports the Insta360 X5, a rugged, jobsite-ready camera with long battery life and heat resilience, delivering sharper captures and stronger AI progress tracking.
At Doxel, we know construction doesn’t happen in perfect conditions. That’s why we’re excited to announce full support for the integration of the Insta360 X5 camera with Doxel’s autonomous progress-tracking platform.
The X5 isn’t just a sharper video, it’s a jobsite-ready tool engineered to capture in tough conditions and keep projects on track. And when paired with Doxel, it transforms field capture into reliable, AI-driven progress data you can trust.
The Insta360 X5 elevates what’s possible in jobsite documentation:
With X5 integrated into Doxel’s AI platform, contractors gain:
Every missed capture or overheated camera adds risk. With Doxel + Insta360 X5, project teams gain a durable, data-reliable workflow designed to perform where construction actually happens: in the field, in the dust, in the heat and the cold.
Ready to see the X5 in action? Explore how Doxel and Insta360 X5 keep projects on schedule and under control.
Learn more about the Insta360 X5
See how Doxel powers AI progress tracking
The collaboration will use Doxel computer vision to automatically track construction progress to keep projects on schedule and on budget.
[Menlo Park, California] – [8/12/25] – Doxel, the leader in AI-powered progress tracking for construction, is proud to announce an enterprise agreement with Stream Data Centers, a leader in premium, hyperscale-ready colocation and build-to-suit data center development. This partnership reflects Stream Data Centers’ unwavering commitment to collaborating with customers and communities, empowering teams to deliver secure, reliable, and sustainable data center solutions.
.png)
By integrating Doxel's industry-leading computer vision technology into its workflows, Stream gains real-time, objective insights into project progress. “Doxel’s AI-powered progress tracking is an innovative solution to our team’s need for near real-time data on our construction sites. Doxel helps paint an objective picture for our entire project team, so we can all work together to identify and address challenges quickly, before they grow into material impacts to budget or schedule,” said Tejo Pydipati, SVP Design & Construction at Stream.
Doxel's AI-powered progress tracking captures, analyzes, and visualizes construction progress, turning photos into insights. This data-driven approach:
Doxel CEO and Founder, Saurabh Ladha, stated, "We are thrilled to partner with Stream Data Centers in helping them deliver projects on time and on budget. With Stream’s enterprise-wide adoption of Doxel, we are setting a new standard for project speed and performance. This rapid construction is critical in supporting global investment in Artificial Intelligence."
About Doxel | Doxel.ai is transforming construction management with AI-powered progress tracking. By providing real-time, data-driven insights, Doxel speeds up construction by empowering construction firms to deliver projects with greater efficiency, accuracy, and control.
About Stream Data Centers | Stream Data Centers (streamdatacenters.com) is headquartered in Dallas, Texas and is the technical real estate affiliate of Stream Realty Partners, a full service commercial real estate investment, development and services company with 1,550+ professionals in 20 core markets, and $8.9 billion in annual transactions.
Media Contact:
Shankar Bellam
Doxel
shankar@doxel.ai
See how AI-powered progress tracking helps data center teams identify schedule risks earlier and build with confidence.
Doxel is heading to Singapore for Data Centre World Asia 2026, taking place September 29–30 at the Sands Expo & Convention Centre as part of Singapore Technology Week. As an LED Wall Sponsor, Doxel will showcase how AI-powered Work-in-Place (WIP) tracking and schedule analytics help project teams identify schedule risks earlier, improve coordination, and make faster decisions throughout construction. Come visit us at booth 3G2.
Southeast Asia's data center pipeline has moved fast over the past two years. Singapore is a central hub for hyperscalers, colocation providers, and contractors racing to deliver capacity across a region where power, land, and skilled labor are tighter constraints than in more established markets.
That pressure shows up on the jobsite. Compressed schedules, fragmented regional supply chains, and delivery models that vary market to market all make it harder to know, with any confidence, where a project actually stands. Teams are still leaning on manual walk-throughs and self-reported updates to answer a basic question: is the work installed, and is it on pace with the plan?
Data Centre World Asia brings the people wrestling with that question into one room — five concurrent tracks covering the Global Stage, Keynote Theatre, Energy Security & Efficiency, Critical Infrastructure, and OCP Tech Day. It's a good cross-section of where APAC data center construction is headed, and exactly the audience we built Doxel for.
Doxel turns weekly site walks into objective, component-level progress data, tracking installed work against the plan, flagging schedule risk early, and giving owners, GCs, and trade partners a shared, factual view of where a project stands. No more disputes over whose version of “done” is right.
Teams using Doxel get:
• Automated progress tracking tied directly to the schedule
• Earlier visibility into delays, before they become critical-path problems
• A single source of truth that keeps owners, GCs, and trades aligned
• Benchmarking across projects to spot where production is slipping
For a region building as many facilities, as fast as APAC is right now, that kind of visibility isn't a nice-to-have; it's what keeps a portfolio of projects on schedule.
Doxel's team will be at booth 3G2 throughout the show: Spencer Clayton, Dom Pound-Palmieri, Jesse Gill, Hamza Abukar, and Sridhar Rengasamy, our APAC Lead. Sridhar has spent years working on large-scale infrastructure projects across Southeast Asia and is happy to share his expertise on the region.
If you're attending Data Centre World Asia and want to talk about a live or upcoming project, stop by booth 3G2 or reach out to Sridhar on LinkedIn to set up time.
We'll see you in Singapore.

LCI Congress 2026 is the place to be to see how AI-powered progress tracking gives Lean construction teams objective visibility into project progress, helping improve planning, coordination, and delivery.
Doxel is excited to return as a sponsor of LCI Congress 2026, where owners, contractors, designers, and Lean practitioners will explore the strategies and technologies shaping the future of project delivery. Taking place October 12-16, 2026, in Atlanta, Georgia, LCI Congress brings together construction leaders focused on improving collaboration, reliability, and continuous improvement.
Date: Thursday, October 15, 2026, 3:45-4:30 PM

Panelists:
- Moderator - Chris Vine, LCI-CPC, DBIA, CM-Lean Champion, Project Superintendent, Hensel Phelps
- Speaker - Brandon Bergener, Sr. Superintendent, Layton Construction Company LLC
- Speaker - John Rewolinski, Head of Schedule Analytics, Doxel
Lean construction depends on accurate, timely information. Yet many teams still rely on manual jobsite walks and spreadsheets to understand project status.
Doxel's AI-powered Work-in-Place (WIP) tracking gives Lean teams objective, real-time visibility into construction progress, helping project teams compare plan versus actual performance, improve coordination, and identify schedule risks earlier.
Whether supporting Last Planner System®, Takt planning, or flow reliability, Doxel provides trusted progress intelligence that helps teams make faster, more informed decisions.
Stop by Booth #113 to learn how leading construction teams are using AI-powered progress tracking to:
We're also proud to sponsor the LCI Congress Golf Tournament, including Hole #6 and the TaylorMade Golf Kit giveaway.
LCI Congress 2026 | October 12-16, 2026
Signia by Hilton | Atlanta, Georgia
Visit Booth #113 to how AI-powered progress tracking is helping teams deliver projects with greater certainty, consistency, and confidence.
The conference brings together leaders focused on solving the biggest challenges in AI infrastructure, including prefabrication, digital construction, power availability, and accelerated project delivery.
Doxel is heading to the Builtworlds Buildings Conference: Data Centers & AI Infrastructure to demonstrate how AI-powered progress tracking helps owners and contractors reduce schedule risk and accelerate data center delivery.
AI infrastructure projects are growing larger, faster, and more complex, making objective progress visibility more important than ever.
The event takes place September 30 to October 1 in Nashville, Tennessee. As a Premier Sponsor, Doxel will showcase how AI-powered Work-in-Place (WIP) tracking and schedule analytics help project teams identify schedule risks earlier, improve coordination, and make faster decisions throughout construction.
Thursday, October 1 | 2:10 PM – 2:50 PM

Speakers
What is reality on your jobsite? Your P6 says one thing, your trade partners say another. On a hyperscale data center, having near real-time, objective progress data helps you make better decisions to stay on schedule. In this session, a DPR superintendent and Doxel product leader share real stories from the field: catching a piping trade's slide months before it became a crisis, discovering security rough-ins installed three feet off design, and proving drywall was way ahead of schedule to a skeptical client with a single click.
Join Reid Senescu and Mike Miller as they share how computer vision turns weekly 360° site walks into objective, component-level progress data that keeps trades on plan, settles disputes with evidence instead of arguments, and drives the coordination conversations that build data centers faster. You'll leave with practical adoption lessons—including why a dashboard on the wall beats a hyperlink in an inbox every time.
This year's conference focuses on the challenges shaping modern AI infrastructure, including prefabrication, digital construction, power availability, and project delivery. These priorities align closely with Doxel's AI-powered Work-in-Place (WIP) tracking and schedule analytics, giving project teams objective insight into progress so they can reduce risk and make faster decisions.
Visit Doxel during the conference to learn how leading data center teams are using AI to:
We look forward to connecting with owners, contractors, and technology leaders at BuiltWorlds to discuss how AI-powered progress tracking is helping deliver the next generation of data centers with greater certainty.

Doxel is proud to sponsor DCD Connect London 2026, joining Europe's leading data center owners, developers, contractors, engineering firms, and technology providers to explore the future of AI-powered data center construction.
Europe's data center market is entering a new phase of growth. AI infrastructure, power availability, sustainability mandates, and gigawatt-scale developments are reshaping how projects are planned and delivered, and owners and contractors need greater visibility into performance to keep pace.
Doxel is sponsoring DCD Connect London 2026, joining Europe's leading data center owners, developers, contractors, engineering firms, and technology providers for two days of industry insight and collaboration. Held September 16–17 at the Business Design Centre in London, the event brings together more than 5,000 industry leaders, 150+ exhibitors, and 280+ speakers shaping the future of digital infrastructure.
Data center development is expanding beyond traditional FLAP-D markets into the Nordics, Mediterranean, and Eastern Europe, even as developers navigate grid constraints, evolving sustainability regulations, labor shortages, and increasingly aggressive delivery schedules. In this environment, accurate progress tracking and early risk identification aren't optional; they're what keep gigawatt-scale programs on schedule.
Doxel replaces manual reporting with automated progress tracking to keep teams aligned with hard facts that leave no ambiguity on where the project is today, where it will be tomorrow, and what decisions need to be made to land it on schedule and on budget. With Doxel, construction professionals have full observability on their site while providing their field teams with the powerful tools they need to prevent delays, over-billing, rework, and trade stacking.
Visit Doxel to see how leading project teams use AI to:
Whether you're delivering a single hyperscale facility or managing a multi-campus portfolio, Doxel gives you the construction intelligence to reduce uncertainty and improve outcomes.
Event Information
Event: DCD Connect London 2026
Dates: September 16–17, 2026
Location: Business Design Centre, Islington, London, UK
Book a meeting with the Doxel team at DCD Connect London to see how AI-powered progress tracking is helping Europe's data center builders deliver with greater confidence and control.

Doxel is heading to DCAC USA 2026 on August 24-26 at the Austin City Limits Live, Moody Theater. Come see us on “The Porch” on August 24th-26th.
Known as “The People’s Conference,” DCAC USA has become one of the most respected operator- and builder-focused gatherings in the data center industry. As a Gold Partner, Doxel will join data center owners, operators, engineers, contractors, and delivery leaders for candid discussions around the realities of building critical infrastructure at scale.
DCAC USA brings together the industry's top owners, developers, contractors, and technology innovators for three days of networking, collaboration, and conversations driving the future of mission-critical construction.
As AI infrastructure expands, project teams need better visibility and more reliable ways to deliver increasingly complex construction programs. Doxel's AI-powered Work-in-Place (WIP) tracking and schedule analytics provide an objective view of construction progress, helping teams identify risks earlier, improve coordination, and make faster, more informed decisions.re using AI to:
The next challenge in data center construction isn't building one project. It's building the next project more efficiently than the last.
Doxel is excited to attend the Data Center Investment Conference & Expo (DICE): South, where data center developers, owners, contractors, and technology leaders will explore the strategies shaping the next generation of AI infrastructure.
Texas continues to lead the nation's data center expansion, fueled by unprecedented AI demand and billions of dollars in new investment. Recent announcements include major financing for new Texas campuses and hundreds of planned projects across the state, reinforcing the region's position as one of the world's fastest-growing data center markets.
Delivery at Scale: How to Move From One-Off Wins to a Repeatable System

Panelists:
Location: Dallas, Texas
Dates: Wednesday, Aug 12-13, 2026
Event Page
As AI infrastructure expands from single facilities to multi-campus programs, contractors must deliver consistent results despite labor shortages and increasingly aggressive schedules. John Rewolinski will join industry leaders to discuss practical strategies for building repeatable delivery systems that improve project performance at scale.
Doxel's AI-powered Work-in-Place (WIP) tracking and schedule analytics give teams objective, real-time visibility into construction progress, helping them identify risks sooner, improve coordination, and make faster decisions.
Visit Doxel at DICE South to see how leading data center builders are using AI to:
Learn how Doxel is helping data center teams deliver faster, with greater confidence and consistency.

Doxel is heading to DCAC Europe 2026 on June 23–24 at The Roundhouse in London. See us on "The Balcony" during the event on June 24.
Known as “The People’s Conference,” DCAC Europe has become one of the most respected operator and builder-focused gatherings in the data center industry. The event brings together owners, operators, engineers, contractors, and delivery leaders for candid discussions around the realities of building critical infrastructure at scale.
Unlike larger corporate trade shows, DCAC Europe is intentionally designed around community, practical conversations, and operational insight. The event consistently attracts the people directly responsible for solving some of the industry’s most challenging problems.
“We are in the middle of the fastest industrial shift in human history — the 5th Industrial Revolution. AI, compute, power, labor, land, capital, and community trust are colliding in real time, yet the world still fundamentally misunderstands the sector making it all possible.
Data centers are not background infrastructure. They are the front line of the AI era. That disconnect is no longer just frustrating. It is actively dangerous.
Misconceptions around our industry are slowing workforce development, delaying policy clarity, impacting community trust, and creating friction across project execution and capital deployment. This year, DCAC is focused on confronting that narrative head-on.” - DCAC Team
DCAC Europe brings together the people responsible for building and operating some of the world’s most complex data center projects.
That is why Doxel continues to attend year after year.
The event creates valuable opportunities to connect directly with teams focused on improving construction performance, increasing schedule certainty, reducing risk, and delivering projects faster with greater predictability.
Doxel helps owners and contractors gain objective visibility and actionable insights into construction progress through AI-powered progress tracking. By comparing field conditions against BIM models and schedules, teams can identify risk earlier, improve coordination across trades, and make faster, more informed decisions.
Instead of relying on subjective updates or delayed reporting, project teams gain measurable visibility into actual production progress across the jobsite. This allows teams to understand what is truly complete, what is falling behind plan, and where intervention may be needed before delays compound.
On major projects, Doxel has helped teams move beyond subjective “rule of thumb” tracking toward objective production benchmarking and real-time operational insight.
This level of visibility becomes increasingly important on fast-moving data center projects where even small coordination issues can create cascading schedule impacts across multiple trades and work areas.

Representing Doxel at the event includes Faiz Alidina, Director of Sales, EMEA, Ken Denning, David Brody, Hamza Abukar, and Dom Pound-Palmieri.
Doxel will also participate in the networking and community events surrounding DCAC Europe, including the DCAC Charity Golf event on June 23 at Sudbury Golf Club.
If you are attending DCAC Europe 2026, connect with Doxel to learn how leading data center teams are improving visibility, predictability, and execution certainty across complex construction programs.
Event website: DCAC Europe 2026
From June 2–4, Doxel will join thousands of leaders across the global data center ecosystem at the 2026 Datacloud Global Congress (DGC) 2026 in Cannes, France.
Held at the iconic Palais des Festivals et des Congrès, Datacloud Cannes brings together hyperscalers, developers, investors, operators, and construction leaders shaping the future of AI infrastructure and digital capacity expansion.
With more than 6,000 attendees expected, this year’s event arrives at a critical moment for the industry. AI demand continues to accelerate the construction of data centers globally, while labor shortages, power constraints, and schedule pressures continue to intensify.
As a Silver Sponsor, Doxel will be exhibiting at Booth #317 with full EMEA sales, product, and customer coverage on site, including participation in the event’s pre-conference cycling activities.
The conversations at DGC align directly with the challenges Doxel helps solve every day on large-scale projects.
Across the industry, owners and builders face mounting pressure to deliver complex facilities faster while maintaining quality and reducing risk. At the same time, construction productivity continues to lag behind other industries despite increasing project complexity and demand. For data center teams building hyperscale campuses and AI infrastructure, delays and missed coordination windows can quickly create cascading schedule impacts.
That is why objective, real-time construction visibility has become increasingly important.
Throughout Cannes, Doxel will showcase how leading owners and contractors are using AI-powered progress tracking to improve schedule certainty, benchmark production, and reduce costly surprises in the field.
Doxel automatically captures and analyzes site progress against BIM models and schedules, giving teams real-time visibility into what is actually happening on site. The platform eliminates the delays and inconsistencies that come from manual reporting and subjective progress tracking.
On major projects, Doxel has helped teams move beyond “rule of thumb” project management by introducing objective production benchmarking and real-time performance insights. DPR Construction used Doxel to improve benchmarking consistency and increase confidence in decision-making across projects.
As owners demand greater predictability and transparency across capital programs, Doxel gives teams what traditional reporting systems often cannot: a live operational view of project execution.
To support our efforts at Datacloud Cannes, we are launching a digital billboard campaign across key areas surrounding the Palais des Festivals and La Croisette.
The campaign reinforces a core message increasingly resonating across the data center market:
You cannot accelerate delivery without objective visibility into production.
The creative highlights our ability to help owners and builders deliver construction faster through automated progress tracking, real-time production insights, and proactive risk detection.
The campaign also reflects a broader shift happening across construction. Owners are beginning to manage construction investments with the same operational rigor applied across the rest of their business.
Attendees can meet with our team throughout the event to discuss how AI-powered construction analytics are helping data center teams improve execution certainty at scale.

If you are attending Datacloud Cannes 2026, stop by Booth #317 to see how we’re helping teams deliver complex projects with greater speed, visibility, and confidence.