The collaboration will use Doxel computer vision to automatically track construction progress to keep projects on schedule and on budget.
[Menlo Park, California] – [8/12/25] – Doxel, the leader in AI-powered progress tracking for construction, is proud to announce an enterprise agreement with Stream Data Centers, a leader in premium, hyperscale-ready colocation and build-to-suit data center development. This partnership reflects Stream Data Centers’ unwavering commitment to collaborating with customers and communities, empowering teams to deliver secure, reliable, and sustainable data center solutions.
By integrating Doxel's industry-leading computer vision technology into its workflows, Stream gains real-time, objective insights into project progress. “Doxel’s AI-powered progress tracking is an innovative solution to our team’s need for near real-time data on our construction sites. Doxel helps paint an objective picture for our entire project team, so we can all work together to identify and address challenges quickly, before they grow into material impacts to budget or schedule,” said Tejo Pydipati, SVP Design & Construction at Stream.
Doxel's AI-powered progress tracking captures, analyzes, and visualizes construction progress, turning photos into insights. This data-driven approach:
Doxel CEO and Founder, Saurabh Ladha, stated, "We are thrilled to partner with Stream Data Centers in helping them deliver projects on time and on budget. With Stream’s enterprise-wide adoption of Doxel, we are setting a new standard for project speed and performance. This rapid construction is critical in supporting global investment in Artificial Intelligence."
About Doxel | Doxel.ai is transforming construction management with AI-powered progress tracking. By providing real-time, data-driven insights, Doxel speeds up construction by empowering construction firms to deliver projects with greater efficiency, accuracy, and control.
About Stream Data Centers | Stream Data Centers (streamdatacenters.com) is headquartered in Dallas, Texas and is the technical real estate affiliate of Stream Realty Partners, a full service commercial real estate investment, development and services company with 1,550+ professionals in 20 core markets, and $8.9 billion in annual transactions.
Media Contact:
Shankar Bellam
Doxel
shankar@doxel.ai
Doxel heads to Denver on August 21 for DICE Rockies, where our VP of Mission Critical, Daniel Cheney, discusses Accelerating Development: Balancing Total Cost of Ownership and Speed to Market.
August 21, 2025 | Denver, CO
Event: DICE Rockies – Data Center Investment Conference & Expo
Doxel is heading to Denver for DICE Rockies 2025, the leading event for those tracking the explosive growth of the region’s data center market. As AI demand accelerates and power constraints grow tighter, developers and contractors are facing new challenges in site selection, cooling, and operational resiliency.
This year, our VP of Mission Critical, Daniel Cheney, will take the stage with practical insights on what it takes to deliver large-scale projects when every day and every dollar counts.
In this session, Daniel will share lessons from the field on how to move quickly without sacrificing control. He’ll dive into how owners and builders are optimizing schedules and budgets using real-time progress tracking, especially in high-stakes environments like the Rockies.
Doxel’s AI-powered visibility platform helps teams spot issues early, make informed decisions, and stay on track through every phase of construction.
At DICE Rockies, we’re looking forward to deeper conversations on:
These are the questions defining where and how mission critical projects move forward. With better field visibility, teams can respond faster, make smarter trade-offs, and deliver with confidence.
Let’s connect in Denver and talk about how AI can help you build with speed, certainty, and control.
Doxel Joins Oracle Innovation Lab Tour at AGC Tech Conference 2025
Doxel is hitting the ground in Chicago for a unique opportunity at the AGC Technology Conference — the Oracle Innovation Lab Tour. This isn't your typical conference booth. It's an immersive, hands-on experience where general contractors, schedulers, and construction pros can see construction tech in action.
📍 Location: Oracle Innovation Lab, Chicago
📅 Date: August 5, 2025
🔗 Event Page
Instead of a trade show floor setup, Oracle’s Innovation Lab offers an interactive, small-group format. Doxel will be giving live demos at our dedicated station as attendees rotate through the space. No passive presentations. This is a working session where real conversations unfold.
Participants will get a close look at how Doxel replaces slow, manual tracking with automated AI progress verification that ties directly into scheduling tools like Oracle Primavera P6. Our technology empowers field teams and project managers with objective data to catch problems early and stay on schedule.
This event is designed for construction professionals who value practical, field-ready innovation. You’ll see firsthand how Doxel fits into Oracle’s broader CE Suite ecosystem, alongside solutions from VREX, Skydio, Realwear, Anybotics, and other partners.
We’re helping project teams:
From 9 AM to 4 PM, the day includes immersive tech sessions, a product roadmap overview, networking, and lunch. It’s a chance to talk shop with peers, swap insights, and see how integrated tech can drive your projects forward.
Whether you're an executive, scheduler, or site leader, this event shows how Doxel’s AI closes the gap between the plan and the field.
Exploring Trends Around Building at Scale, Designing for Artificial Intelligence, and Supporting Energy Infrastructure
Exploring Trends Around Building at Scale, Designing for Artificial Intelligence, and Supporting Energy Infrastructure
DATE: FEB. 20. 2025 @ 9:00 AM EST / Virginia
FEATURED SESSION: 2:45 PM – 3:30 PM EST
Redefining the Status Quo: Best Tools, Approaches, and Techniques to Build the Most Efficient and Innovative Data Centers
With AI and its power demands at the forefront of stakeholders' minds, examining how to push the boundaries of standard design and practices and reduce inefficiencies will be critical to the bottom line. How are developers and their partners working to reduce the carbon footprint and rethink standard practices as more data centers with larger footprints come online?
Moderator
Join industry leaders to explore the evolving trends and challenges shaping data center construction and design in East Coast markets. Learn how developers and stakeholders are navigating critical topics, including:
Connect with decision-makers in commercial real estate, including owners, investors, engineers, designers, and industry executives.
Stay ahead of industry trends, uncover opportunities, and strengthen your network in a rapidly growing sector.
For speaking or sponsorship inquiries, contact Adam Knobloch at adam.knobloch@bisnow.com.
"The Future of Smart Hospitals and Healthcare Industry" event is Oracle's premier gathering for owners, healthcare stakeholders, and technology innovators.
📅 Date: February 4, 2025
📍 Location: Oracle Industry Lab, Deerfield, IL.
"The Future of Smart Hospitals and Healthcare Industry" event is Oracle's premier gathering for owners, healthcare stakeholders, and technology innovators. Hosted at the renowned Oracle Innovation Center, this venue provides a dynamic space for showcasing cutting-edge solutions in healthcare construction. Known for hosting unique events like reality capture demonstrations and indoor drone races, the Innovation Center sets the stage for forward-thinking collaboration.
This year, Oracle emphasizes owner attendance and healthcare-focused content, making it a prime opportunity to engage with key decision-makers shaping the industry's future.
Doxel will participate in Oracle's interactive Hands-on Innovation Experiences, delivering 15-minute sessions demonstrating how our technology revolutionizes project tracking and execution for healthcare construction projects.
With a focus on owners and healthcare decision-makers, this event provides unparalleled access to industry leaders.
It's an excellent opportunity to foster strong relationships with Oracle's product team and other innovators in the healthcare construction space.
Through the Hands-on Innovation Experience, we'll highlight how Doxel's capabilities drive better outcomes and more innovative processes for healthcare construction.
We're excited to be part of this visionary event and look forward to sharing highlights and insights from "The Future of Smart Hospitals and Healthcare Industry." One of our top product leaders will represent Doxel at the event, ensuring insightful engagement with attendees and Oracle's team.
Learn more about the event here.
Understand how every system contributes to trade-level progress with clearer visibility into on-site activities.
In the fast-paced construction of data center, life sciences, manufacturing, and hospital projects, keeping up with construction progress is both challenging and essential. Increasing project complexity requires greater emphasis to coordinate work and understand risk on the project.
That’s why we’re excited to introduce Systems View within Doxel’s Work In Place (WIP) view. This new capability offers a deeper, system-level visualized breakdown of construction progress, giving teams clearer visibility into on-site activities and enabling a more precise understanding of the project's status.
Systems View is an advanced feature in the WIP view that allows teams to go beyond trade-level tracking, providing a detailed 3D view of construction progress for specific systems within each trade, such as hot water and chilled water within plumbing. Systems view is particularly useful for complex mechanical, electrical, and plumbing systems. This added layer of granularity offers project teams deeper insights into the progress of each system, empowering them to monitor and manage intricate project details.
In complex projects, traditional tracking did provide valuable trade-level insights but often lacked the detail needed to align each system with Takt times, leading to inefficiencies. With Systems View, project teams will gain real-time, system-specific insights that empower them to monitor each system’s adherence to Takt schedules, catching issues before they become bottlenecks.
With this added visibility, teams can identify delays early and reallocate resources as needed to maintain steady progress. Ultimately, Systems View reinforces Takt Planning and the Last Planner System, driving projects toward efficient milestone completion.
Imagine a typical Monday coordination meeting for a data center project. The Project Manager or Supervisor is focused on the progress of the mechanical system in Data Hall 1, where multiple subcontractors are working concurrently. The meeting kicks off with questions about the status of supply ducts and whether the HVAC team has completed their work.
With Doxel's Systems View, the project engineer can instantly access progress data for HVAC ducts, filtering by both system and zone. In just moments, the team discovers that only 80% of the supports are installed, with delays caused by mechanical piping in the same area. Using the system filter, they isolate the data and confirm that the piping crew is scheduled to finish by day’s end, clearing the path for the HVAC team to complete their work.
This level of real-time, system-specific insight enables more effective coordination, allowing the supervisor or project manager to make informed decisions on the spot. The result? No wasted time, better workflow sequencing, and a more streamlined project timeline.
Data center construction is highly sophisticated, involving multiple systems that must be meticulously coordinated. Before the introduction of Systems View, project managers relied on trade-level data, making it challenging to understand system-specific delays or progress. With Systems View, project managers can:
For example, in one data center project, the HVAC system installation was delayed due to incomplete electrical work in the same zone. Using Systems View, the project engineer quickly identified the bottleneck, reallocated resources, and adjusted schedules. This proactive management helped the team finish the system installation on time, preventing downstream delays and additional costs.
Industries like life sciences, manufacturing, and healthcare demand strict timelines, compliance, Strict timelines, compliance requirements, and intricate system interdependencies drive construction projects in industries like life sciences, battery manufacturing, and hospitals. Systems View empowers project managers to:
Systems View helps teams deliver complex facilities efficiently and predictably, whether managing cleanroom infrastructure, advanced manufacturing lines, or hospital surgical suites. By providing granular tracking, it enables earlier inspections, faster system sign-offs, and mitigates risks that could impact schedules or budgets.
Stay tuned as we continue to enhance Doxel's capabilities, bringing more tools to help you deliver projects on time and within budget.
Construction projects have long struggled with inefficiencies, fragmented workflows, and unmet expectations from technology. Using Doxel and Touchplan together offers a unified workflow for continuous improvement. Together, these platforms empower teams to reduce waste, enhance collaboration, and achieve outstanding project results.
"If teams use Touchplan alongside Doxel, it would provide excellent confirmation that what we have done is what we said we were going to do. It would also allow us to look forward in the progress charts and ensure our forecasts for activities align." said Project Controls Manager, CRB.
Transform your weekly planning from a manual, time-intensive process into a dynamic, digital workflow. Touchplan’s digital pull planning and Look-Ahead Planning tools enable real-time collaboration, helping teams anticipate roadblocks and ensure efficient planning at every project phase.
Doxel uses AI-driven progress tracking to provide live updates on project execution. By automating activity monitoring and delivering visualized progress insights, Doxel keeps site performance aligned with plans, ensuring accountability and maximizing productivity.
Touchplan and Doxel combine advanced technology with proven Lean Construction methods to create a unified workflow for continuous improvement. Teams can analyze progress trends, address inefficiencies, and refine workflows, driving success both today and on future projects.
Leaders like CRB are already experiencing measurable success, setting a new benchmark for construction excellence
Doxel is excited to partner with DCAC, the people’s conference designed to inspire and evolve the data center industry.
Doxel is excited to announce its participation in the groundbreaking Data Centre Automation Conference (DCAC) Live Europe 2024 conference, which will be held in Dublin, Ireland, from October 15 to 16, 2024.
Doxel is excited to partner with DCAC, the people’s conference designed to inspire and evolve the data center industry. Aligned with DCAC’s mission to disrupt, challenge, and foster collaboration, Doxel looks forward to contributing to the meaningful conversations and connections that propel visionaries, builders, and manufacturers forward in this fast-growing sector.
DCAC Live Europe 2024 will gather top industry professionals from the world of data center automation and focus on how cutting-edge technology can enhance critical infrastructure efficiency, scalability, and automation.
Doxel accelerates construction by automating progress reporting, identifying hidden issues early, preventing rework, and improving collaboration through visual data. Attendees will be able to see advanced Doxel features, including:
Doxel’s platform automatically leverages AI to track project progress, providing real-time insights into productivity, cost, and quality. This allows teams to make data-driven decisions, reducing delays and keeping projects on budget.
Doxel uses predictive analytics to spot potential risks before they turn into problems. This proactive approach helps teams avoid costly overruns and delays in projects, keeping them running smoothly and on time.
With Doxel, data is collected automatically throughout the project lifecycle. This allows for continuous progress monitoring and ensures stakeholders have visibility into every aspect of the construction process.
Doxel’s simple dashboards make complex data easy to understand and help teams make quick, informed decisions for better project results.
Visit Doxel’s table for live demonstrations of its AI-driven platform. See how automated progress tracking helps monitor, manage, and control every stage of your data center project. Meet with the Doxel team to discuss challenges and explore custom solutions tailored to your needs.
As the demand for data centers grows, effective and automated construction progress tracking is more critical than ever. DCAC Live Europe 2024 is a great opportunity for data center professionals to learn about the latest in automation and technology. With expert-led discussions, technical workshops, and solution showcases, attendees will stay ahead in the evolving data center landscape.
DCAC Live Europe:
Website: DCAC Live Europe 2024
Insights from DCAC 2024 with Doxel CEO Saurabh Ladha and Joseph Pinzon, CRO of Overwatch.
In the latest episode of the Data Center Revolution Podcast from DCAC 2024, Saurabh Ladha, CEO of Doxel and Joseph Pinzon, CRO of Overwatch deliver an insightful conversation on the cutting-edge advancements in data center construction. Here are some of the topics covered during the podcast:
Catch the full conversation below and explore how technology is reshaping data center construction:
– Joseph Pinzon, CFO, Overwatch.
A McKinsey report shows stagnant construction productivity for decades. By adopting modern practices, owners can drive a new era of construction productivity.
Better tools for the field and reducing risk on every project!
Long considered the backbone of economic growth, the construction industry continues to face a productivity challenge that cannot be ignored any longer. According to a McKinsey report, construction productivity has remained stagnant for decades, with the sector’s growth rate falling far behind that of the global economy.
For an industry that influences everything from infrastructure to housing, this productivity gap is not just a business problem—it’s a societal one. However, a growing consensus is that construction owners who commission and pay for projects hold the keys to transforming the industry. By leveraging their influence and adopting modern practices, owners can be the driving force behind a new era of construction productivity.
Before exploring solutions, it’s essential to understand the scope of the problem. McKinsey’s analysis highlights that construction productivity has only increased by 1% annually over the past 20 years, compared to 2.8% for the global economy. This productivity gap has resulted in significant cost overruns and delays, with projects exceeding budgets by 80% and timelines by 20 months on average. The industry must adopt new innovative technologies and practices faster to mitigate this trend.
The factors contributing to this stagnation are numerous, including:
Given these challenges, it’s clear that a radical shift is needed. And that shift can start with the owners.
Owners play a pivotal role in the construction ecosystem. They are the ones who set the expectations, define the scope, and ultimately bear the financial risk of projects. Owners can drive change across the industry by taking a more active role in risk mitigation and pushing for productivity improvements. Here’s how:
1. Adopting Performance-Based Contracts
One of the most effective ways for owners to drive productivity is by adopting performance-based contracts. These contracts tie compensation to achieving specific milestones and performance metrics, such as staying within budget or completing a project on time. This approach aligns contractors’ incentives with the project goals, encouraging them to innovate and find more efficient work methods.
2. Embracing Digital Transformation
Digital tools can revolutionize construction, from design to execution to delivery. Owners who prioritize digital transformation can see significant productivity improvements. For example, Building Information Modeling (BIM) allows for more accurate planning and coordination, reducing the likelihood of costly errors and rework. Doxel empowers construction teams with AI-driven project benchmarking and analytics, enabling faster, data-backed decisions that reduce costs and improve on-time delivery.
According to McKinsey, using digital tools could improve overall productivity by 14-15% and reduce project costs by 4-6%. Project management software can also streamline communication and collaboration, ensuring all stakeholders are on the same page.
3. Leveraging Technology for Project Benchmarking
One of the most potent tools that owners can use to enhance productivity and benchmark their projects is Doxel. Doxel is a powerful tool for project owners looking to enhance productivity and benchmark their projects. Its Production Rate tracking simplifies comparing completed work against the schedule, enabling owners to measure progress and manage timelines effectively.
The data collected from the site is analyzed to deliver precise insights into project progress, quality, and potential risks. With Doxel, owners can establish clear benchmarks, compare them against industry standards and past performances, and identify inefficiencies early. This empowers them to make informed decisions that keep projects on track, within budget, and up to the highest quality standards.
By integrating Doxel into their project management practices, owners gain a significant competitive advantage, ensuring precision and efficiency in every project.
4. Fostering Collaboration and Integration
The fragmentation of the construction industry is a significant barrier to productivity. Owners can address this by fostering a more collaborative and integrated approach to project delivery.
Integrated Project Delivery (IPD) is one such approach, where all parties—owners, contractors, architects, and engineers—work together from the outset, sharing risks and rewards. This collaborative environment encourages innovation and problem-solving, improving outcomes for all involved.
5. Prioritizing Sustainability and Resilience
Sustainability and resilience are increasingly important in construction, not only for environmental reasons but also for long-term cost savings and productivity gains. Owners who prioritize sustainable practices, such as energy-efficient designs or renewable materials, can reduce their projects’ lifecycle costs. Furthermore, resilient designs that withstand extreme weather events or other disruptions can minimize downtime and maintenance costs, ensuring the project remains productive over its lifespan.
A skilled workforce is crucial for enhancing construction productivity, but the industry is currently grappling with a significant labor shortage. With many skilled workers nearing retirement and fewer young people entering the field, construction projects face increasing risks. However, Owners can address these challenges by investing in the right technology, such as Doxel, which offers three key solutions to keep projects on track:
(1) Accelerating the onboarding process due to its ease of use,
(2) Boosting jobsite worker productivity, and
(3) Enabling project leaders to identify when additional skilled trades are urgently needed to meet schedules.
Feedback from our clients highlight that Doxel helps onboard new engineers quickly, bringing them up to the level of experienced superintendents. Moreover, Doxel reduces the time spent manually tracking progress by 95%, freeing up the most skilled team members to focus on higher-value tasks.
While attracting more people to the industry is vital, a long-term perspective is essential. However, Doxel provides an immediate impact by optimizing the available labor on-site. For skilled trades, Doxel’s production rates are particularly valuable. They empower superintendents with hard data, allowing them to demand additional labor from trade partners when it’s clear that the current workforce won’t meet project deadlines. This data-driven approach helps ensure that projects stay on schedule and that trade partners fulfill their commitments, avoiding potential liabilities for delays.
Featured Case Study:
Layton Construction’s experience with Doxel has been transformative, particularly regarding time savings and efficiency. On a recent 82,000 SqFt healthcare facility project, six superintendents and project engineers were initially spending a combined 60 hours per week manually tracking progress. With Doxel’s technology, this time was slashed by 95%, reducing the task to just 3 hours total. This significant reduction in manual labor translates to 57 hours saved weekly, allowing the team to redirect efforts toward safety, quality, and effective coordination with trade partners—resulting in an additional $2.17 per square foot per year being reinvested into these critical areas.
The benefits continued beyond time savings. Doxel enabled a 10% reduction in overbilling by providing precise progress tracking, simplifying billing processes, and eliminating disputes over the percent complete. Additionally, Doxel’s production rate tracking made it easier to secure commitments from trade partners to meet deadlines, ensuring the project stayed on time. As Brandon Bergener, Superintendent at Layton Construction, noted, Doxel has also made it easier to access additional manpower when needed, further enhancing project efficiency and productivity.
When owners lead in driving productivity improvements, the benefits extend beyond individual projects. Here are some of the broader impacts:
While the potential benefits are clear, driving productivity improvements in construction is challenging. Owners may encounter resistance from contractors accustomed to traditional working methods or stakeholders who are wary of the costs associated with new technologies. To overcome these barriers, owners should:
The construction industry is at a crossroads. It must overcome its productivity challenges to remain cost-effective and meet future demands. With their unique influence and authority, owners are in the best position to lead this transformation. Owners can drive the industry forward by adopting performance-based contracts, embracing digital tools, fostering collaboration, prioritizing sustainability, and investing in workforce development. The time for change is now, and the future of construction lies in the hands of those who are willing to push it forward.
Delivering on construction productivity is no longer optional—it’s essential. By taking a proactive role, owners can unlock the full potential of their partners and projects and set a new standard for the industry as a whole.
Citations:
McKinsey & Company. “Delivering on construction productivity is no longer optional.” Retrieved from McKinsey & Company.
For general contractors and owners, AI-powered progress tracking ensures accuracy by providing a single source of truth on percentage completed.
At their core, construction projects rely on cash flow. But it isn’t always simple—considering the complexity of projects and the fact that a company is likely managing multiple of them at once. Some projects take months or years to complete, and payments happen throughout the entire duration.
With so many payments coming and going over the course of a project, it’s crucial for project teams to stay on top of daily progress and constantly evaluate where it stands financially. Otherwise, a project is at risk for being under or overbilled. Billing accuracy is vital for any large scale construction project success.
They may seem self-explanatory, but let’s get a few terms out of the way:
Overbilling occurs when a contractor is ahead of their progress and bills for contracted labor and materials before the work is completed. While this may help offset slow payments, it puts the contractor at risk of spending the extra money on something else if they don’t realize they’ve overbilled.
Underbilling happens when a contractor completes a certain amount of work on a project, but doesn’t bill for the full amount. This is typically the outcome of slow billing practices.
Both under and overbilling can lead to a state of negative cash flow, which can be detrimental to a construction company’s profitability and expected outcome on a project.
So, how does it happen?
Even before the project starts, money matters. If contractors are unable to correctly estimate project costs—or worse, underestimate their costs—it could set them up to be underbilled and out of cash before the project is completed. This deeply impacts their ability to make money (or at the very least break even) on the project, and it may go unnoticed until the very end when it’s too late.
If a contractor isn’t precise about what has been completed thus far, they will likely bill incorrectly. Trying to guess the percentage of completion could quickly cause them to over or underbill, and as a result the project’s entire budget will be at risk.
Construction is like a delicate dance, and poor project management could throw the entire routine off balance. Especially on bigger projects with multiple subcontractors, a disruption in one contractor’s ability to complete work could have a ripple effect on the entire project’s timeline and budget.
Effective project management allows a company to catch and correct any potential problems while holding everyone accountable for their part. If everything is settled at the end of the project, it’s already too late and nearly impossible to course correct.
Subcontractors that accurately measure daily progress have the ability to bill more precisely and maximize profits. For general contractors and owners, AI-powered progress tracking ensures accuracy by providing a single source of truth on percentage completed.
Being able to track and even predict progress is a powerful advantage—the more data you have from one unified source, the less likely over and under billing occur, improving billing accuracy.
The best part? The technology already exists to enable companies to collect better, more accurate data with less manual effort. Leveraging features such as automated estimate at completion (EAC) and earned value analysis can help guarantee a company’s project financials and reporting are spot on.
To learn more about the ways your construction company can maximize profitability and improve billing accuracy, schedule a demo today.
Healthcare construction teams that leverage AI-powered performance monitoring are armed with accurate data in near real-time to keep projects on track.
Healthcare construction is a specialized niche in the industry, and the projects within it require a high standard of attention to detail to meet their deadlines. These projects are complex and involve the coordination of large, cross-functional teams to complete them on tight schedules—which means a project’s success is majorly dependent on the efficiency and collaboration of the team building it.
Every day that the facility is delayed or past schedule means another day patients can’t come in, and the owner or company will lose money.
Enter, AI-powered project controls – automated construction progress tracking.
The construction of healthcare projects is a delicate balance of innovation and realism. As one of the more technology-driven sectors, these facilities aim to have the latest and greatest equipment, but at the same time needs to be planned months in advance and available within a certain deadline. Teams must stay on top of an ever-changing landscape and varying demands—so having accurate, objective project progress data throughout is essential.
One of the biggest factors to staying on schedule is knowing exactly where you are. Without a single view of project progress, sticking to a set schedule becomes a risky guessing game. Progress tracking using the power of computer vision enables project teams to build faster and more accurately together.
After all, knowledge is power. Teams that leverage AI-powered performance monitoring are armed with accurate data in near real time to see backwards at what’s been done, as well as ahead at predictive insights.
Rework can be a project schedule’s worst nightmare—and the later it’s caught the bigger a scheduling headache you have on your hands. Rework takes valuable time away from what should be forward progress. In order to achieve schedule predictability, a project team has to be able to spot (and avoid) potential rework on the critical path.
Using computer vision automated construction progress tracking that acts as a digital surveyor, superintendents can quickly catch any missing or incorrectly installed components before the next trade covers up the error. This foresight can help avoid weeks of delays and schedule compression, which ultimately helps the facility stay on track to open on time or earlier.
Real-time automated construction progress tracking doesn’t just help with new healthcare construction—it can also help reduce downtime during facility operations down the road.
Picture it (if you dare): A construction company closes off an area to cut into the wall and fix MEP services only to discover that it wasn’t installed per as-built plans. Instead of adhering to the plan, dreaded rework is now required.
But what if you had x-ray vision instead? Comprehensive reality capture of an as-built facility ensures maintenance teams know exactly what was installed and where, so any maintenance and retrofits can be done efficiently without the rework. Instead of costing days of downtime, teams can get in and get it done as planned the first time.
At its core, Doxel is automated construction progress tracking that provides objective, accurate data on materials installed for real-time project controls. The more teams can document in the moment, the more productive and proactive they become.
Find out how healthcare projects have used Doxel to deliver facilities earlier and at a higher standard of quality.
Doxel is thrilled to partner with Corscale in revolutionizing the landscape of data center construction, setting a new standard for the industry.
Gainesville, VA – (November, 2023) – Corscale, the exclusive data center platform of the Patrinely Group, has announced that it will be deploying Doxel, the leader in AI automated construction progress tracking to speed the pace of construction and reduce waste on upcoming data center construction.
“Corscale is focused on implementing industry leading construction and sustainability initiatives. We are committed to building efficiently. Doxel will help us accelerate construction schedules and deliver critical data centers faster.” said Nic Bustamante, Chief Technology Officer for Corscale. Prior to his current position, Nic was the Senior Vice President of Development at Corscale and held leadership roles at Apple, Google, and Microsoft.
The rise in artificial intelligence, specifically Natural Language Processing (NLP), computer vision, and machine learning, and robotics, is increasing the already strong demand for data center solutions. Corscale will now harness the power of AI to build the data centers that deliver AI.
“Doxel is thrilled to partner with Corscale in revolutionizing the landscape of data center construction. Corscale’s commitment to industry-leading initiatives aligns with Doxel’s mission to transform construction through the power of AI. We aim to enhance the efficiency and sustainability of constructing data centers, setting a new standard for the industry. This collaboration represents a significant stride toward the future, where AI not only powers data centers but also drives their seamless and sustainable construction.” – Saurabh Ladha, CEO of Doxel.
The partnership with Doxel reflects Corscale’s forward-thinking approach to stay at the forefront of technological advancements. By incorporating AI into the construction process, Corscale not only meets the rising demand for data center solutions but also pioneers a path toward intelligent, sustainable, and swift data center deployment.
Corscale Data Centers is focused on delivering sustainability at scale. As the exclusive data center platform of the Patrinely Group, Corscale, together with its capital partner USAA Real Estate is delivering tomorrow’s data center, today. The company has assembled a top-tier team of industry professionals who bring decades of experience designing, building, and operating sustainable, high-density data centers for some of the largest and most sophisticated hyperscale operators and enterprises. Corscale delivers highly scalable, secure, and energy-efficient build-to-suit powered shells as well as flexible modular deployments. To learn more, please visit Corscale.
Doxel is focused on speeding up construction and reducing waste by using AI to automate progress tracking. Doxel believes in the power of aligned teams and designed Doxel to unlock their full potential. With Doxel, owners have full observability on their site while providing their field teams with powerful tools that prevent delays, over-billing, re-work, and trade stacking. Backed by Insight Partners, Amplo, and Andreessen Horowitz and with a growing team of engineers, scientists and construction veterans, Doxel is driven to help their customers win.
For media inquiries, please contact:
Corscale Media Relations
press@doxel.ai
Doxel Media Relations
press@doxel.ai
Accurate, reliable data allows construction companies to remove subjectivity and replace it with objective accountability.
Communication can make or break a construction project. A report from the Project Management Institute found that ineffective communication was the main contributor to project failure one-third of the time. An even more alarming finding from the research is that 56% of budgets allocated to projects are at risk due to poor communication.
Without objective insights alignment among field and office teams, knowing what’s happening on a project becomes a daunting task—one that could put a project (and its profitability) at risk.
1. Delayed communication
Timely communication (especially between the field and the office) is hard to achieve. Field teams are focused on a hundred different things at once, and relaying project updates typically happens at the end of their day. Because field leaders aren’t able to instantly communicate every facet of a project’s progress as it happens, there is a lag time and gap in each day’s reporting.
2. Inconsistent communication
In addition to being delayed, communication from the field to the office isn’t always consistent. The more variables and people added to the equation, the more potential for confusion and uncertainty. Communication on a project can very quickly turn into a game of telephone—and teams are forced to hold more meetings and conversations to ensure mutual understanding.
3. Missing communication
While delayed and inconsistent communication can hold a project back, missing communication can halt it entirely. If proper communication isn’t happening, neither is profitable building.
All these challenges in communication don’t just create extra stress and work on a project—they can have a deeper impact on the data and tracking, too. Without everyone on the same page, the reporting and insights are left to everyone’s individual perspective. As a result, the project’s insights suffer.
Accurate, reliable data allows construction companies to remove subjectivity and replace it with objective accountability. Insights that are trackable and consistent bring everyone together on the same page to make informed decisions, faster.
Improve communication and progress tracking
Streamline billing and accountability
The key to collecting reliable insights is through automated progress tracking. The right tool can increase team alignment and communication, without adding effort to the project team’s plate.
Doxel brings predictability to construction projects by providing critical insight with objective analytics. The AI-powered computer vision builds a digital twin of the jobsite on a weekly basis—providing true progress reporting and near real-time data. Doxel acts as a digital surveyor to capture and quantify project progress and eliminates the need for teams to manually calculate and report on it. The result is detailed, shared progress tracking from a single source across every project stakeholder and subcontractor.
Strategies for maintaining a healthy work-life balance.
Doxel CEO Saurabh Ladha is featured on The QTS Experience Podcast with David McCall. David and Saurabh discuss the impact of waste and rework in construction.
Saurabh discusses how Doxel integrates AI with established processes to build faster. Join us for the conversation, on the next QTS Experience. Episode 191; Saurabh Ladha: Intuitive Construction, AI, Doxel, Innovation, Data Center.
Advice for maintaining mental health in the workplace.
Many construction companies are at a crossroads as they think about the future of their business, and who will be a part of it.
More than 40% of the current U.S. construction workforce is expected to retire over the next decade. This generation of seasoned superintendents and project leaders will leave behind big shoes to fill in both skill and knowledge, and the industry’s current skilled labor shortage doesn’t exactly help either.
While many owners, GCs and trade contractors have programs in place to mentor younger generations and train them to step in, it won’t be enough to bridge the gap. That’s why it’s important for companies to ensure they are innovating to attract more workers of a new generation.
The construction industry has made huge strides to change and adopt more technology, but it can’t stop now. The younger generation that’s coming into the workforce over the next ten years was raised in a time where technology was already prevalent and is like second nature to them.
If a company wants to attract and retain a new generation of field leaders, they need to have processes in place that don’t just utilize technology, but are on the forefront of innovation, too.
A project isn’t truly done until it’s done done. And whether or not it gets to done done on time and under budget all comes down to how it’s being tracked during the construction phase. The old way of progress tracking involves a ton of manual effort and even more paper. Field teams would have to document what happened by hand on a regular basis and manually report on the overall progress completed.
Not only was this inefficient and extremely time-consuming, it also made it nearly impossible to try to predict where the project was headed or spot any potential issues fast enough to fix them. Even with the utilization of 3D and BIM models, knowing where a project stands hasn’t been as automated as it should be.
Convincing new, younger workers to take on these outdated processes isn’t an easy sell. Chances are, they’ll feel their time is being wasted since they are so used to the convenience and automation that technology can bring. In order to attract more workers to be on project and field teams, the processes they follow need to be seamless and even a little exciting.
Construction companies that are leveraging artificial intelligence and machine learning to automate the collection and analysis of project data are already ahead of the game. While the new generation may be more traditionally more technologically savvy, AI is new and exciting to everyone.
Rather than spending hours per week manually inputting and calculating progress and materials, solutions like Doxel use AI alongside 360-degree capture to automatically identify true, objective progress. This ability to bring predictability to projects doesn’t just save field teams time—it provides critical insights that help avoid delays and cost overruns at the overarching project level.
Instead of them feeling like just another cog in the machine there to collect data over and over again, technology of this caliber empowers workers to think critically about the status of projects and seek a deeper understanding of what’s happening each day. Not to mention the sense of fulfillment that comes when a team works together on a project that is able to be completed earlier with increased safety, less expense, and higher quality.
We can help you empower a new generation of field leaders. See how Doxel works in a personalized demo today.
Doxel’s computer vision-based progress tracking leverages AI to act as a digital surveyor that delivers insights and reporting in real time.
Now more than ever, construction companies are looking for ways to stand out from the competition—and that starts with staying on top of the latest technology that helps them build more efficient, profitable projects.
The future of construction technology will be a hybrid of artificial intelligence (AI) and machine learning working alongside the industry’s workforce.
But what does that mean?
Put more simply, artificial intelligence is the brain of the computer, and machine learning is the part of that brain that learns from data and makes informed decisions based on what it has learned.
Computer scientists have found a way to make the process of designing a building more efficient and accurate. By starting with the goals and parameters of a project, generative design is able to explore every possible iteration of a solution until it comes up with the best option.
This technology and its use has the potential to save architects and designers countless hours upfront—but it doesn’t replace the human touch completely. Once the optimal solution is found for the design of a building, a designer still needs to fine-tune the details and take it from there.
Robots are being utilized on construction projects to perform repetitive tasks (such as bricklaying) using AI to detect changes in conditions and maximize efficiency. While only a few robots have been added to the project ranks so far, it is expected that more of these AI-powered workers will be used as a method of streamlining productivity.
What’s our favorite robot in construction, you ask? Meet Spot: a robot dog created by Boston Dynamics used to carry image-capturing or laser scanning equipment that ventures where humans can’t. Spot’s ability to walk himself autonomously around a jobsite, including on uneven terrain, makes him a project’s best friend. Spot may not have AI infused into his DNA yet, but the future generations of Spot will incorporate AI for predictive and preventative analysis.
Milwaukee Tool first dabbled into the technology space with their wirelessly connected tools, but they’ve since enhanced their capabilities with AI to pinpoint the exact locations of where a tool was last seen. And they didn’t stop there—by adding algorithms and more advanced sensors to their tools, Milwaukee is able to combine the data of a motor drive with motor load information to make decisions on false trips.
It should come as no surprise that these technological concepts are being applied to the most important priority in construction: safety. Companies like NewMetrix have created an AI-powered solution to help predict (and prevent) safety incidents on projects.
By leveraging a construction-specific AI model, their platform can analyze existing data along with their proprietary program to provide actionable incident insights that have the power to keep workers safe.
While BIM has opened the door for 3D modeling of a project, it’s still nearly impossible to tell the progress or quality of a build without a human resource to manually sift through and analyze images. That is, until now.
Doxel’s computer vision-based progress tracking leverages AI to act as a digital surveyor that delivers insights and reporting in real time. It can automatically analyze visual data, measure installed quantities, and inspect quality for more than 75 different construction stages. This not only saves companies time, it also mitigates the risk of errors and delays that could become costly.
Putting the model in the hands of field teams every step of the way gives them immediate access to see where their efforts line up (or don’t) for the project.
Ever since the pandemic, QR codes have had a resurgence in society. When the world turned contactless, restaurants and businesses began leveraging QR codes for menus and signage. These small codes have since become a go-to for pulling up web pages quickly and conveniently.
As QR codes continue to become more prevalent, other industries have taken note and discovered ways to leverage them—and construction is no exception.
But before we get into that, let’s cover some basics.
The ‘QR’ in QR codes stands for Quick Response, which makes sense when you think about the way they work. By pointing a device’s camera at the code, a destination link is pulled up and can be accessed instantaneously.
While they may have become most popular after 2020, these codes are not a new technology. QR codes were first created in 1994 by the Japanese company and Toyota subsidiary Denso Wave as a more accurate way to track vehicles and parts during the manufacturing process. The original intention behind QR codes was to reinvent the barcode by making something that was easy to scan and could hold more data than the average barcode.
In a time where businesses needed to (and continue to) adapt, QR codes and smartphones have become a powerful duo to further streamline access to information.
It’s no secret the construction industry is facing some challenges. From labor shortages to supply chain, the circumstances have further shown the importance of operational excellence on a project. To help combat these challenges, maintain a high standard of execution, and minimize risks of mistakes, many construction companies have found technology to be the answer.
Can QR codes play a part in this? In our webinar Almost Done Isn’t Done, one Doxel customer shared his team’s innovative way of incorporating QR codes around the job site to bring everyone on the same page, faster.
By strategically placing QR codes around key points of the job site, all the contractors for the project are able to instantly access the corresponding models and plans needed. That way, when the contractor is getting ready for the install or build, they can simply scan the QR code to confirm what they need to accomplish.
Putting the model in the hands of field teams every step of the way gives them immediate access to see where their efforts line up (or don’t) for the project. This makes it easy to ensure accuracy while progress is being made versus waiting until it’s too late.
How do companies make their own custom QR codes? Here’s a handful of solutions to consider:
While this technology is helpful enough on its own, the destination of the QR code is what can really make the difference on a project’s path to operational excellence.
Let’s talk about what happens when laser scanning and real-time progress tracking join the party.
Doxel’s AI-powered tool automatically maps and overlays 360-degree video to the BIM and 3D models. The split view allows teams to quickly understand what’s in progress and what’s done, along with the quality of installed systems.
Site progress is automatically quantified and visualized and can be differentiated by trade to compare what’s there to what should be—and as a result everyone is objectively aligned on true progress.
Imagine all this at the touch of a button, a scan of a code. With the convenient access of QR codes connected directly to Doxel, field teams can better (and more instantly) answer two of a project’s biggest questions:
Are things where they are supposed to be?
Are we on schedule?
By having the color-coded, easy to understand analysis of progress just a QR code scan away, project teams can be more proactive and accurate in their work.
If you’re ready to take your project models to another level, schedule a demo of Doxel today.
Work In Progress reports provide accurate progress data that project teams can trust across the entire site.
Construction is a unique industry in many ways, one of which being the flow of cash and accounting process for projects. Whereas many industries have straightforward transactions and payments, construction costs tend to be more complex and nuanced—which makes it more difficult to stay on top of a budget with money constantly going out and coming in.
From estimation and bidding to delays and change orders, there are many stages and factors that go into determining the cost (and profits) of a project.
How can companies know if they’re on schedule and under budget before the project closes? Work in progress is the answer.
A work in progress (or, WIP) schedule is a detailed report that shows the percentage of progress completed on a project—and takes into account any work that’s in progress in relation to budget and profitability. Below are four reasons WIP Reporting is essential on every project!
When it comes to a project’s progress, communication is critical. Without clear, real-time communication, project teams waste valuable time meeting to discuss and determine where a project stands. Progress can also be misrepresented or miscalculated, which directly impacts the budget and schedule of a project. With so many moving parts to balance, construction companies can’t afford to make mistakes due to miscommunication.
WIP reports provide accurate progress data that project teams can trust across the entire site. This reduces any subjectivity throughout the building process and gives everyone one source of truth to work from.
Many contractors choose to implement progress payments, which means the project is billed based on certain percentages of completion as they’re reached instead of waiting until the end of a job. Combine progress payments with inaccurate progress reporting, and the project can very quickly become overbilled (revenue billed exceeds the work completed) or underbilled (work completed exceeds what’s been billed).
WIP tracking provides the exact progress percentage of work completed to create a shared understanding and accountability for project costs accrued so far—and can help shed light on any discrepancies in the budget to prevent future cash-flow problems. This is especially helpful for those project managers who like to ‘guesstimate’ based on a gut feeling, then try to do the math later to even it out.
Hindsight may be 20/20, but it won’t keep your project profitable. A problem is much harder to fix after it’s already happened. While discussing what went wrong at the end may help your next project, the power to be able to notice and act in real time is invaluable. Project teams need to be able to spot potential problems as early as humanly possible to minimize the impact and keep everything on track.
That’s where work in progress tracking comes in—it’s in the name. Using technology that quantifies progress all the way down to the subcomponent level allows stakeholders to catch an issue and course correct as soon as (if not before) it happens. This prevents mistakes from becoming costly and provides insight for better business decisions in the future.
While catching issues early on is one thing, being able to predict a project’s future is another. With the right AI-powered progress tracking, companies can track project performance for deviations from plan and forecast a more accurate estimate at completion.
Knowing where your project is heading before you get there means you can plan accordingly and get ahead of costly trends. WIP tracking data gives project teams the ability to confidently manage the schedule and predict delays.
At the end of the day, work in progress reports give a true and accurate view of the financial health of a project. However, they require accurate project progress data to be effective.
Companies that leverage technology with AI-powered progress tracking can truly reap the benefits of WIP reports—and ultimately keep their projects on track and profitable.