Doxel is excited to join DCAC Europe 2025, Europe’s premier event for advancing digital infrastructure. Held in Dublin, this two-day summit brings together the top minds in data center design, engineering, and construction to tackle challenges in speed, scale, and delivery certainty.As pressure grows to deliver high-performing data centers faster and more reliably, DCAC Europe provides a critical forum for exploring how innovation is reshaping project execution across the region.
Doxel at DCAC Europe 2025: Accelerating Progress with AI-Powered Visibility
Doxel is excited to join DCAC Europe 2025, Europe’s premier event for advancing digital infrastructure. Held in Dublin, this two-day summit brings together the top minds in data center design, engineering, and construction to tackle challenges in speed, scale, and delivery certainty.
As pressure grows to deliver high-performing data centers faster and more reliably, DCAC Europe provides a critical forum for exploring how innovation is reshaping project execution across the region.
📍 Location: Dublin, Ireland
📅 Date: May 13–14, 2025
🔗 Event Page
Doxel’s Advanced Progress Tracking equips teams with real-time visibility into progress—improving alignment with plan, reducing rework, and enabling faster decisions on the ground. As the industry adopts more ambitious build schedules, tools that reveal truth on the jobsite are more essential than ever.
At Doxel, we believe visibility drives velocity. We’re proud to support the construction leaders building tomorrow’s infrastructure—and we’re here to learn, collaborate, and grow with the industry.
Doxel is proud to join the Data Center Investment Conference & Expo (DICE): National, one of the most influential events for data center developers, operators, owners, and end users. As the demand for AI and digital infrastructure accelerates, DICE National brings together industry leaders to explore the tools and strategies shaping tomorrow’s data centers.
Doxel is proud to join the Data Center Investment Conference & Expo (DICE): National, one of the most influential events for data center developers, operators, owners, and end users. As the demand for AI and digital infrastructure accelerates, DICE National brings together industry leaders to explore the tools and strategies shaping tomorrow’s data centers.
Onsite Construction: Implementing The Best Tools and Technology for Project Delivery
Panel Speaker: Reid Senescu, VP of Product Management, Doxel
Panelists:
📍 Location: Virginia, USA
📅 Date: Tuesday, May 20 – Thurs, May 22, 2025
🔗 Event Page
Reid will join fellow experts to discuss how modern construction technology is driving better outcomes—from reducing rework to improving schedule certainty and visibility in the field. Doxel’s Automated Progress Tracking solution is helping teams deliver with speed, precision, and control—at scale.
As the industry scales to meet global data center demand, Doxel is proud to support owners and builders with the technology to keep pace—on time, on budget, and with full transparency.
Stop by and learn how we’re helping construction teams build smarter, and deliver physical intelligence.
Big things are happening in Dubai. Doxel is headed to DCD>Connect MENA 2025!
Doxel is proud to participate in DCD>Connect MENA 2025, one of the most anticipated data center summits in the region. With demand for digital infrastructure skyrocketing across the Middle East, this event brings together key stakeholders to address the challenges of building capacity at scale.
Daniel Cheney will join a high-profile panel alongside leaders from Batelco, CIB Egypt, Nxtra Africa, and Pure Data Centres Group to discuss the future of data center construction and how to keep pace with rapid regional growth.
📍 Location: Dubai, UAE
📅 Date: April 16, 2025
⏰ Time: 15:00–16:00
🎤 Panel: DCD>Major Panel: Building the Future – Meeting Booming Capacity Demands in the Region
🧑💼 Panelists: Daniel Cheney, VP of Sales, Doxel; Sayed Hasan Amin, Head of Operations, Batelco; Yashnath Issur, CEO, Nxtra Africa; Hosam Mohie, Data Centers Manager, Commercial International Bank Egypt; Steffen Zimmermann, Project Director, Pure Data Centres Group
Attendees will hear from major developers and technology providers on topics such as hyperscale expansion, schedule certainty, workforce constraints, and sustainability. Doxel will showcase how construction teams can improve outcomes using its AI-powered Work-in-Place (WIP) tracking platform, enabling real-time comparisons of field progress against the plan.
As new markets emerge and capacity demands surge, speed, transparency, and control are more important than ever. “Meeting capacity demand in MENA isn’t just about building faster—it’s about building smarter. Doxel equips data center teams with the tools to drive measurable improvements in speed, cost, and reliability.”
– Daniel Cheney, VP of Sales
Ezra Klein rings the alarm that the $1.6 trillion U.S. construction industry has not shared the productivity gains of other industries. After two decades into a career focused on bringing productivity gains to construction, Reid Senescu, Vice President of Product at Doxel.ai has an idea that can alter this trend.
In his February 5, 2023 opinion piece in the New York Times, Ezra Klein rings the alarm that the $1.6 trillion U.S. construction industry has not shared the productivity gains of other industries. He cites Goolsbee and Syverson’s paper “The Strange and Awful Path of Productivity in the US Construction Sector,” which explains that construction productivity has decreased since 1950 while manufacturing productivity, for example, has increased ninefold. I appreciate Mr. Klein’s alarm as well as his humility in admitting he has no idea how we get construction productivity rising again. Two decades into a career focused on bringing productivity gains to construction, I do have an idea.
But before I get to my idea, let’s consider Mr. Klein’s prime culprit – regulatory “paperwork, and paperwork, and more paperwork.” No doubt regulation impacts construction productivity; regulation impacts most industries. While Syverson’s paper does not provide data connecting productivity declines to increased regulation, it does note that the construction industry invested 46 percent less in R&D and software purchases compared to the broader economy in 2020. And, a separate paper by Syverson, “The Slowdown in Manufacturing Productivity Growth,” (my fellow construction colleagues will take solace in knowing we are not alone in facing Syverson’s economic scrutiny) explains that information technologies (IT) were the main driver for productivity gains in manufacturing from 1994 to 2005.
Why did IT so dramatically impact manufacturing, but not construction? In both construction and manufacturing, IT can improve productivity once information about the real world is transformed into data. Consider an assembly line producing widgets. The assembly line has sensors that send data to machines to respond in real time and to plant managers who learn of bottlenecks and continuously improve the assembly line. This investment in sensors produces the data that powers IT and drives productivity increases.
Applying IT to construction is not so easy. While a factory produces millions of widgets, a construction project is the assembly of millions of different components to produce only a single facility. A single sensor cannot automatically monitor the installation of thousands of square feet of walls or linear feet of ductwork. And that limitation means that IT is starved of data that would help construction workers and managers gain insights to continuously improve their processes. Thus, until recently, investment in IT has been limited to the design phase and certain aspects of construction administration. Yet, labor is the greatest cost on any project in the U.S. And, IT has had virtually no impact on the productivity of that skilled craftworker laying a brick or welding a beam to a column.
But, that reality is changing. With artificial intelligence (AI) and computer vision, leading builders are transforming 360 video into near real-time measurements of construction processes. This near real-time reality capture of the construction site acts like sensors in a factory, feeding IT with data that empowers project teams to increase productivity. For example, a construction superintendent constructing a retirement community recently used this automated progress tracking technology to identify that a certain duct installation activity was not yet complete on the 3rd floor. Ceilings were set to be installed the next day. Without this insight from technology, the unfinished ductwork would have been covered up by the ceiling trade partner. And, when they later discovered the oversight, they would have had to rip open the ceiling. That rework would have put a big dent in their productivity. Instead, the AI-powered IT indicated the ductwork was not 100% complete. Augmented with this information, the superintendent applied his expertise in coordinating trades to get the ducts installed right away to avoid the rework. And, the general contractor and retirement community owner no longer had to explain to residents why they were going to be moving in two weeks late.
This technology is new; we only began building it in 2015. But we’re seeing results. At Doxel, we’ve created automated progress tracking for construction that reduces time spent manually tracking progress by 95%. This automation creates data that is now fueling productivity gains from IT just like in manufacturing. And, it gets data to decision makers 5x – 10x faster, which gives 5x – 10x the opportunities to unlock the full potential of construction teams to accelerate schedules and deliver projects under budget. We’re not alone in augmenting construction team expertise with AI; companies such as Procore, Autodesk, Oracle, Dusty, Rhumbix and dozens of others have built technology that makes construction easier for millions of workers every day. And, forward looking facility owners are hungry to adopt solutions that reduce their risk and make the job easier for superintendents and trade partners, because they know the investment will translate to projects that are on time and on budget.
Of course, an industry’s health depends on more than a single metric. Construction provides nearly 11 million jobs in the U.S., including many high paying roles that do not require a college degree. They are rewarding jobs that contribute to society. But, the work is not easy. It frequently requires complex problem solving or complex physical skills. These are great jobs, partially because they can’t be easily automated to increase productivity. Still, productivity is an important metric not just for economists, but because it tends to correlate with the industry’s per capita income. According to Syverson, construction pay could be 10% higher if the industry’s productivity gains tracked the economy as a whole. Society needs construction to be easier, too. As we face challenges supplying healthcare, delivering energy, and investing in infrastructure, construction will either be a bottleneck to change or it will be a catalyst to change. AI augments the experience and skills of construction teams, so they have better data and tools and owners have the confidence to invest in projects that solve society’s 21st Century challenges.
Written by Reid Senescu, California Licensed Professional Engineer and PhD in Civil and Environmental Engineering from Stanford University. He is the Vice President of Product at Doxel.ai in Menlo Park, California. His research focused on how technology can improve construction team collaboration. At Doxel.ai, his products use computer vision to help teams collaborate and deliver projects on time and on budget.
Doxel’s AI technology enables Oracle’s customers to have real-time, objective visibility into their schedule performance
Doxel, an AI-based construction technology solution that enables proactive risk mitigation of projects and portfolios, announced its integration with Oracle’s Primavera P6 Enterprise Project Portfolio Management (EPPM), the solution for globally prioritizing, planning, managing, and executing projects, programs, and portfolios.
The Doxel and Oracle integration will enable customers to track construction progress continuously and automatically against their Oracle Primavera P6 schedules. Unlike manual methods of progress reporting that can be subjective or delayed, Doxel’s AI technology enables Oracle’s customers always to have real-time, objective visibility into their schedule performance.
Proactive mitigation of delays and identification of opportunities to accelerate construction—enabling customers to deliver their projects faster while collecting valuable benchmark data for future planning in Oracle Primavera P6 EPPM.
“This integration with Primavera P6 is by popular demand from our mutual customers, and we couldn’t be more excited,” says Saurabh Ladha, chief executive officer of Doxel. “Nearly 100% of our customers use Primavera P6 for scheduling, and this unification of workflows will supercharge our customers’ abilities to manage their projects and portfolios proactively.”
Doxel, based in Menlo Park, California, has built a widely adopted platform that applies AI and computer vision technology to 360-degree video of construction sites and measures progress in a granular, real-time, and automated fashion, and then contextualizes actual progress against Primavera P6 EPPM plans.
Through Doxel’s cloud-based dashboard, customers can instantly see where they’re ahead and behind, informing their decisions with data that can always be trusted and delivered in time for proactive actions that ultimately land projects on schedule and budget.
“We see project teams use Doxel AI and Primavera P6 side by side in construction trailers. P6 is an amazingly powerful scheduling and planning tool and requires information from the field that can accurately, objectively, and with higher frequency measure and constantly update progress. Because if you don’t have high-quality data feeding into it, its value diminishes exponentially,” says Garrick Ballantine, Doxel’s chief revenue officer.
He adds, “General contractors and owners use the combination of P6 and Doxel to objectively partner with their trade partners on a week-to-week basis, bringing the field and office on the same page with our cloud-based visual dashboard and to make payment decisions on billions of dollars’ worth of construction nationally. This integration has happened because the industry demanded it.”
Frank Malangone, Oracle’s executive director of innovation and industry strategy, said, “Our customers continue to look for ways to objectively and accurately measure progress to update the schedule for reliable insights. This connection between Primavera P6 and Doxel speeds up this process without constantly having to be at the job site and improves communication and coordination between the office and the field.”
This article original appeared on Oracle’s blog.
By providing accurate and automated cost budget analysis, companies are able to better understand their project and where it stands against the budget.
With inflation and rising cost of materials, it’s critical for healthcare companies to keep construction projects on schedule and within budget. Here are 4 ways to help verify your construction billing and keep your project on budget.
Automated construction progress tracking provides an objective view into exactly where the project stands, which can help mitigate contractors overbilling for a higher percentage of completion. Companies that use a single source of truth for progress tracking (like Doxel) can reduce monthly bills by up to 10%.
With money still left on the table, contractors will be more motivated to finish the job so they can get paid.
Change orders are inevitable—but transparency around them should be, too. Before a major healthcare provider started working with Doxel, they estimated 4% of their total spend was caused by inaccurate progress tracking. These additional COs are passed onto the healthcare company, and are avoidable with the right solution in place.
Leveraging AI-powered progress tracking takes the mystery out of CO estimates. While using Doxel, one healthcare company found their typical change order estimates were inflated by at least 10%. That money is going out the door, and eventually it will add up. With more accurate project tracking, companies can more accurately pinpoint where change orders should be and reduce unnecessary spend.
Due to the unpredictability of material requirements, HealthTrust Contracts run the risk of being underutilized, and healthcare companies miss out on potential rebates and discounts offered. Doxel helps drive 100% contract utilization with more accurate, objective, and standardized measurement of materials installed across projects—which in turn allows more materials purchased through HealthTrust and greater financial savings.
For one Doxel healthcare customer, that meant the ability to purchase 10% more through HealthTrust, and the savings added up to a whopping $18.56M annually through discounts and rebates on materials.
Time is money. When a project’s progress is manually tracked, the process itself to collect and report on the data takes valuable time away from contractors and field teams. What used to take 60+ hours of manpower a week to manually assess progress now takes a mere 3 hours per week using an automated solution like Doxel. All that time can now be focused on safety, quality control, and coordination of trade partners.
See why healthcare companies (and contractors) choose Doxel
Doxel’s image recognition gives healthcare facilities objective progress data and real-time insight into materials installed. With automated project tracking, everyone wins—contractors spend less time counting and reporting, and healthcare companies have better control over project costs and governance.
Healthcare facilities using Doxel are delivered earlier with increased safety, less expense, and higher quality. To learn more about how they do it, schedule a demo today.
Achieving success in healthcare construction projects requires a focus on transparency, risk management, and benchmarking. By leveraging near real-time data and advanced technology, stakeholders can ensure project efficiency, mitigate risks, and deliver high-quality outcomes within expected timelines.
Healthcare projects are not typical commercial construction. Aside from the complexity and cost, healthcare carries a higher level of risk and liability with patient care depending on the outcome of the project. With more at stake, accuracy and predictable outcomes are paramount to the success of the project.
At the foundation, there are three pillars to success for any healthcare project: transparency, risk management, and benchmarking.
Let’s take a look at each of these pillars—and at how automated progress tracking can help companies meet these requirements to help teams complete projects on time and under budget.
Transparency between owners, general contractors, and subcontractors is critical in hospital construction because it ensures every step of the way that the project is following the schedule, budget, and required quality standards.
Clear communication and the sharing of real-time information makes it easier to identify and resolve any issues that may arise during the construction process, which can prevent delays and cost overruns.
Additionally, proper transparency makes sure all parties are working towards the same goals and that everyone is aware of the project’s progress and any necessary changes. In the case of hospital construction, it’s important that transparency is maintained to ensure the safety and well-being of the patients, staff, and visitors—both during construction and after it’s completed.
How can construction companies improve transparency among all stakeholders? Here are five processes that can help.
Due to the costs and complexity of healthcare projects, it is crucial to mitigate risk to ensure safety, quality, and compliance. Risk is inevitable in construction, but there are steps you can take to reduce and ensure better outcomes for your projects.
By following these steps, healthcare construction projects can manage risk and improve outcomes. Even better, there’s technology that alleviates the manual component to many (if not all) of the steps needed to mitigate risk.
By pairing 360-degree video capture with AI-powered progress tracking, teams are able to objectively measure progress of work in place with every data capture, every week. This provides healthcare construction projects with real-time information on the progress and quality of what’s been completed.
Automated progress tracking is the best way to bridge everything together to keep project teams on the same page and catch potential issues faster with enough time to fix them—ultimately preventing delays and unnecessary overruns. This greater degree of transparency and accountability helps to ensure that all parties are meeting their obligations and building to the required standard of the project.
Benchmarking in healthcare construction provides a way to measure and compare the performance of different projects. Leveraging benchmarks helps to identify best practices and areas for improvement, which can be used to set goals and targets for future projects. Benchmarking can also reveal trends and patterns across projects to identify any potential risks and opportunities earlier on.
Healthcare construction benchmarking can inform decision making and contribute to the success or failure of a project. For benchmarking to be most impactful, project progress should be collected in a standardized and repeatable way. Implementing an automated way to analyze project progress in real time helps save time and ensure meaningful insights—ultimately leading to more predictable outcomes, as well as improved quality, cost, and schedule performance.
Automated progress tracking works to streamline the three pillars for project success by providing objective information and greater visibility into the project’s progress. Between project teams and stakeholders, everyone is able to be more closely involved to make more informed decisions faster.
With all parties working towards the same goals, everyone is aware of the objective progress metrics as well as any changes needed. With the right solution in place, teams can increase efficiency, decrease risk, and save valuable time and resources.
Not sure where to get started? Click here to learn more about Doxel’s digital surveyor and analytic tools for healthcare construction today.
Finding remaining work can feel like finding a needle in a haystack, but Doxel makes it straightforward.
Identifying what’s still pending can feel like finding a needle in a haystack, especially when less than 10% of a particular trade’s work remains. Doxel has updated the Work In Place visualization to make it easier to find remaining work.
Managing a large construction project involves ensuring that millions of components are installed correctly, in the correct sequence, across many trade partners. Put simply, it’s easy to see what is there, it’s hard to find something missing. As more trades begin their installations, the not installed scope gets occluded, making it hard to visually see what’s left. This leads to a common problem in construction: unfinished in-wall MEP (Mechanical, Electrical, and Plumbing) being covered up by drywall teams, leading to costly and demoralizing rework.
Choosing “Not Complete” in Doxel’s Work in Place visualization is a straightforward approach to solving the challenge of finding remaining work. By isolating the components that are yet to be completed, Doxel enables teams to have focused conversations with trade partners and other responsible parties. This feature empowers site teams to:
The Work In Place visualization helps site teams easily manage and track work installed by providing an automated, color coded 3D model of the structure, broken down by trade, zones, and stages of construction. Now you can select a trade, sort by “Not Complete” and see what is yet to be installed for that trade. This powerful tool answers the critical questions: “What is installed?’, “What is pending?” and “What is not done?” so that construction teams can appropriately manage labor, sequence trades, and hit project milestones.
Traditional construction progress tracking methods rely heavily on manual inspections and subjective reporting, often leading to errors and oversights. With the size and complexity of construction, it is simply too time-consuming and error-prone to accurately count each hanger, pipe, or panel.
Visualizing work in place allows teams to quickly identify remaining work and understand the reasons behind any delays. By sorting by “Not Complete,” superintendents and trades can better coordinate with each other, quickly identifying where they should be working next or identifying missing work. This improved clarity helps teams verify that all tasks are completed, understand their next steps, and ensure that all work is done in the correct sequence.
Additionally, knowing what is left to do is crucial for commissioning and inspection sign-offs. Failing to identify unfinished work can delay these critical milestones, impacting the overall project timeline. By using Doxel’s Work In Place visualization, teams can ensure that all necessary work is completed and ready for inspection, preventing delays and ensuring a smooth progression towards project completion.
Construction is complex and details matter. Doxel’s Work In Place visualization helps teams find the right information quickly. By providing a clear and accurate view of unfinished work, Doxel empowers teams to prevent costly oversights, improve efficiency, and enhance collaboration.