Doxel is proud to sponsor DCD Connect London 2026, joining Europe's leading data center owners, developers, contractors, engineering firms, and technology providers to explore the future of AI-powered data center construction.
Europe's data center market is entering a new phase of growth. AI infrastructure, power availability, sustainability mandates, and gigawatt-scale developments are reshaping how projects are planned and delivered, and owners and contractors need greater visibility into performance to keep pace.
Doxel is sponsoring DCD Connect London 2026, joining Europe's leading data center owners, developers, contractors, engineering firms, and technology providers for two days of industry insight and collaboration. Held September 16–17 at the Business Design Centre in London, the event brings together more than 5,000 industry leaders, 150+ exhibitors, and 280+ speakers shaping the future of digital infrastructure.
Data center development is expanding beyond traditional FLAP-D markets into the Nordics, Mediterranean, and Eastern Europe, even as developers navigate grid constraints, evolving sustainability regulations, labor shortages, and increasingly aggressive delivery schedules. In this environment, accurate progress tracking and early risk identification aren't optional; they're what keep gigawatt-scale programs on schedule.
Doxel replaces manual reporting with automated progress tracking to keep teams aligned with hard facts that leave no ambiguity on where the project is today, where it will be tomorrow, and what decisions need to be made to land it on schedule and on budget. With Doxel, construction professionals have full observability on their site while providing their field teams with the powerful tools they need to prevent delays, over-billing, rework, and trade stacking.
Visit Doxel to see how leading project teams use AI to:
Whether you're delivering a single hyperscale facility or managing a multi-campus portfolio, Doxel gives you the construction intelligence to reduce uncertainty and improve outcomes.
Event Information
Event: DCD Connect London 2026
Dates: September 16–17, 2026
Location: Business Design Centre, Islington, London, UK
Book a meeting with the Doxel team at DCD Connect London to see how AI-powered progress tracking is helping Europe's data center builders deliver with greater confidence and control.


Doxel is heading to DCAC USA 2026 on August 24-26 at the Austin City Limits Live, Moody Theater. Come see us on “The Porch” on August 24th-26th.
Known as “The People’s Conference,” DCAC USA has become one of the most respected operator- and builder-focused gatherings in the data center industry. As a Gold Partner, Doxel will join data center owners, operators, engineers, contractors, and delivery leaders for candid discussions around the realities of building critical infrastructure at scale.
DCAC USA brings together the industry's top owners, developers, contractors, and technology innovators for three days of networking, collaboration, and conversations driving the future of mission-critical construction.
As AI infrastructure expands, project teams need better visibility and more reliable ways to deliver increasingly complex construction programs. Doxel's AI-powered Work-in-Place (WIP) tracking and schedule analytics provide an objective view of construction progress, helping teams identify risks earlier, improve coordination, and make faster, more informed decisions.re using AI to:

The next challenge in data center construction isn't building one project. It's building the next project more efficiently than the last.
Doxel is excited to attend the Data Center Investment Conference & Expo (DICE): South, where data center developers, owners, contractors, and technology leaders will explore the strategies shaping the next generation of AI infrastructure.
Texas continues to lead the nation's data center expansion, fueled by unprecedented AI demand and billions of dollars in new investment. Recent announcements include major financing for new Texas campuses and hundreds of planned projects across the state, reinforcing the region's position as one of the world's fastest-growing data center markets.
Delivery at Scale: How to Move From One-Off Wins to a Repeatable System

Panelists:
Location: Dallas, Texas
Dates: Wednesday, Aug 12-13, 2026
Event Page
As AI infrastructure expands from single facilities to multi-campus programs, contractors must deliver consistent results despite labor shortages and increasingly aggressive schedules. John Rewolinski will join industry leaders to discuss practical strategies for building repeatable delivery systems that improve project performance at scale.
Doxel's AI-powered Work-in-Place (WIP) tracking and schedule analytics give teams objective, real-time visibility into construction progress, helping them identify risks sooner, improve coordination, and make faster decisions.
Visit Doxel at DICE South to see how leading data center builders are using AI to:
Learn how Doxel is helping data center teams deliver faster, with greater confidence and consistency.
With automated tracking, construction teams can ensure that 'almost done' quickly becomes 'completely done.
Let’s face it: Getting stuff done is hard. And getting stuff done in the face of today’s shortages, supply chain issues, and inflation is a daunting task for any construction company. Automated construction progress tracking can help you finish projects faster.
Before we get into that, let’s take a closer look at what’s going on.
Less people from younger generations are choosing a trade or apprenticeship. As a result, the industry is facing a shortage of skilled workers to help complete project milestones. Without knowing how many people can get the work done (and get it done correctly), companies struggle to stay on track.
Those who do choose to go into construction today are still green in their careers and don’t have the experience that seasoned employees do. This creates a learning curve and requires additional time needed to get them up to speed.
Unpredictable factors create unpredictable change—and change requires an added degree of flexibility for the project to adapt to the circumstances. As a result, companies are seeing more design changes come through, and the need to stay on top of assessing and documenting them.
Speaking of unpredictable, the industry ha seen an influx in supply chain issues, causing delays in shipments and—in some cases—a limited supply of the necessary materials available.
Across every industry, prices are going up. Companies must now reconcile their bids and project scopes to maintain profitability.
When the going gets tough, construction stays tougher. The industry is no stranger to uncertainty. Now more than ever, companies need to pinpoint areas of improvement and streamline their processes to maximize efficiency.
With all these factors weighing on a project’s productivity, the margin for error is very low—which means operational excellence is critical for success. Many projects get to a certain stage or near completion, but struggle to accurate assess what’s happening (or not) to get the rest of the way there.
Almost done isn’t done.
If the last 10% of a milestone takes more than 20% of the time—that’s a big, potentially costly, problem.
That’s where automated construction progress tracking comes in. With the right technology in place, companies can save 25% of superintendents’ and field teams time that would otherwise be spent on tracking progress and bringing everyone on the same page. That’s less time in meetings and back-and-forth conversations, more time building.
Real-time automated construction progress tracking gives everyone on a project visibility into the current state, without the need for individual communication. This ensures the project moves as quickly as it can and prevents trade stacking.
Stay on top of milestones with the ability to forecast and predict any slowdowns before they happen—instead of catching them after it’s too late. By automatically capturing more than 75 stages of construction, automated construction progress tracking technology can spot potential issues more efficiently in real time.
By providing accurate and automated cost budget analysis, companies are able to better understand their project and where it stands with the budget. When unforeseen factors or delays hit, you want all the knowledge and numbers you can get to properly adapt and minimize the impact.
In construction, communication can be slow and sparse. Automated construction progress tracking gets everyone on the same page without having to meet to discuss. Having a digital surveyor gives everyone the information and insights they need to collaborate faster—without relying on project resources to collect and report on it.
No matter what gets thrown at the construction industry, a company needs to be resilient and smart to see success on the other side. Companies who invest in the right tools that save time and automate processes have the advantage of receiving data and insights in real time. The faster something is flagged, the faster it can be fixed.
Want to learn how Scripps Health and McCarthy Building Companies are automating construction progress tracking to increase project visibility? Register for our upcoming webinar Almost Done, Isn’t Done.
Streamlining the process for creating detailed reports can free up the project team's focus while enhancing the level of reporting and insights for a company.
In a 2021 Workforce Survey Analysis, AGC found that 88% of companies surveyed were experiencing project delays—that’s nearly nine out of ten. Now more than ever, construction companies are faced with the challenge to do more with less and keep projects on track in the face of unforeseen circumstances.
While certain conditions and factors in the industry can’t be controlled, there are 3 construction workflows that can reduce the margin of error to ensure a project stays resilient. This requires operational excellence in the areas that can be predicted and made more efficient.
What are the three construction workflows a company should prioritize?
Communication among field teams, supervisors, and the office is crucial—and can be cumbersome. With so many moving pieces of a project happening at once, getting the necessary message out to everyone in a timely, effective manner is no easy feat.
Companies need to find a way to remove the barriers to communication. By doing so, they’ll save everyone on the project team valuable time that would otherwise be spent tracking progress, in meetings to get everyone up to speed, or playing telephone.
Quality of construction can make or break a project’s ability to stay on track. Quality issues or mistakes found too late in the process can be the kiss of death for moving onto the next phase—and as a result, teams remain stuck in the final 10 or 20% of completion for too long. This won’t just cost time and manpower, it’ll directly affect a project’s budget and profitability, too.
The only option to streamline and prevent these costly quality issues is to catch them early and address them quickly. Technology that helps companies see progress in real time opens the door for making smarter decisions and adapting faster.
When a project does make it through the final 10%, the work isn’t over yet. Teams must provide an objective, detailed overview of the completion—which again takes time and resources. There’s more information to gather, and no efficient way to compile it using manual efforts alone.
Teams should be focused on projects, not paperwork or reporting. Streamlining the process for creating detailed reports can free up their focus while enhancing the level of reporting and insights for a company.
By implementing a technology that can continuously monitor performance and provide predictive insights, construction companies are able to achieve operational excellence.
Platforms like Doxel act as a digital surveyor to automatically track progress across more than 75 different construction stages in real time, freeing up the project team’s time and resources.
Instead of manually walking the jobsite every day or week to capture exact progress, Doxel works with a 360° video to act as a digital surveyor in minutes. Combining the power of computer vision with BIM means companies have an objective truth of the status of a site—and can understand progress, schedule, and budget better than ever before.
If it sounds too good to be true, it isn’t.
Tune in to our webinar Almost Done, Isn’t Done to hear from two successful construction companies on how they’re leveraging real-time progress tracking to automate and achieve more.
By continuously tracking and analyzing construction site progress in real time, Production Rate Data serves as a single, reliable source of truth for measuring construction progress.
Traditionally, project managers have relied on site visits and progress reporting from their field teams to stay abreast of construction progress. On large capital projects like data centers, semiconductor wafer fabrication plants, or healthcare infrastructure this can become problematic where even small schedule delays lead to large cost overruns. Doxel’s Production Rate Data provides a solution that empowers project teams with additional data in order to monitor construction progress.

Production Rate Data is the information gathered through reality capture inputs (e.g., 360-degree imaging or drone footage), to continuously track and analyze construction site progress in real time. By comparing actual work completed against the planned schedule, this data serves as a single, reliable source of truth for measuring construction progress. It provides project owners with objective, accurate insights that are crucial for managing schedules and ensuring on-time project completion. This innovative approach equips teams with the data needed to identify delays, optimize workflows, and ensure efficient project delivery.
By leveraging this advanced technology, owner’s representatives can monitor projects with a data set they control, guaranteeing transparency and accuracy. Here’s how Doxel tracks completed construction:
Example: Mechanical Pipes and Walls

Doxel’s Production Rate tracking capability simplifies the comparison of completed construction against the schedule, offering a powerful tool for project owners to measure progress and manage schedules effectively.
Understanding how construction software tracks progress can be complex. Doxel simplifies this with a robust methodology:

Productivity is calculated using specific units of measure for each stage based on your work breakdown structure (WBS) in Primavera P6. For example, if the plumbing installation requires 100,000 linear feet of pipe, the unit of measure would be linear feet. The planned number would be 100,000, against which completed construction is measured.
As construction progresses, Doxel updates the number of completed activities. For instance, if only 20,000 linear feet of pipe have been installed for the drainage system, the 360-degree imaging would capture the work, and Doxel would update the percentage of completion for both the stage (drainage system) and the trade (plumbing) to 20%.
To help manage schedules effectively, Doxel introduced the Production Forecasting Calculator. This tool allows users to simulate different scenarios by adjusting crew sizes and production rates to forecast completion. General contractors can manage subcontractors to ensure they stay on schedule. At the same time, owner’s reps can monitor production rates remotely, gaining confidence that construction progress is on track based on actual data.

Production Rate Data compares completed construction against your schedule, providing a single source of truth for measuring construction progress. Doxel’s system allows you to manage productivity for each stage of the construction project by trade, zone, and floor. This capability empowers project owners with a controlled data set that facilitates better communication with general contractors and helps address potential schedule delays proactively.
By giving project owners control of the data, Doxel ensures a higher level of transparency and efficiency in construction management. This innovative approach enhances collaboration and significantly reduces the risk of delays, optimizing time and resources. With Doxel’s Production Rate Data, project owners can confidently steer their projects to successful completion.
Accurate and reliable progress tracking is essential for effective communication and coordination, especially with multiple stakeholders and a higher level of complexity. Automated construction progress tracking can meet these requirements and reduce manual effort, helping you complete your projects faster and on-budget.
Healthcare construction is more complex and has a lot at stake. If not done right, these projects can be costly for everyone involved. Healthcare projects also require a higher attention to detail to keep everything running smoothly.
With more stakeholders involved in the process, companies need to be able to benchmark and be equipped for better prediction, transparency, and ultimately the ability to detect (and curb) problems, deviations, and cost overruns.
Automated progress tracking can meet these requirements and reduce manual effort, helping you complete your projects faster and on-budget.
Progress tracking is critical for project success in healthcare because it allows for real-time monitoring of project performance and a faster identification of issues and challenges, and implementation of corrective actions.
By regularly monitoring progress and performance, project managers and teams can quickly identify areas that are falling behind schedule or budget—and take the necessary steps to address them before they become major issues. Accurate and reliable progress tracking is essential for effective communication and coordination, especially with multiple stakeholders and a higher level of complexity.
Progress tracking can be beneficial beyond one single project, too. Objective progress data and insights can also help to identify areas of success and best practices that can be replicated in other projects, improving overall project performance and company-wide outcomes.
Automated progress tracking can improve transparency during hospital construction by providing real-time, accurate information on the progress of the project. Automated systems can be configured to collect data from a variety of sources, create a single source of truth and present the information in a format that is easy to understand and always accessible.
With the enhanced, real-time visibility that automated progress tracking brings, stakeholders are able to see exactly where the project is at any given time. This clear picture of project status helps improve communication, transparency, and accountability with objective data that eliminate any debate in progress tracking.
Automated progress tracking is a faster way of providing stakeholders with access to the same information. With an automated system, stakeholders are able to see the same data and reports, regardless of their location. Ensuring everyone is working with the same information saves time in reporting and mitigates the possibility of miscommunication or misunderstanding.
Since hospital construction projects often involve large sums of money and have a significant impact on patient outcomes, it’s also useful to have an auditable record of each project’s progress that can be used in demonstrating accountability to funders and regulatory bodies.
Healthcare construction projects need an efficient way to manage and mitigate risk. Proper real-time visibility into the progress of the project can help spot potential issues before they become major problems. This enables project managers and other stakeholders to take proactive measures, rather than waiting until it is too late to take corrective action.
For example, if progress tracking reveals a particular aspect of the project is running behind schedule, the project manager may be able to adjust the project plan to effectively avoid potential delays or cost overruns.
Additionally, progress tracking can help project managers manage and coordinate dependencies between different parts of the project, which further reduces the risk of delay, prevents trade stacking, and mitigates other issues arising from one part of the project impacting others.
Progress tracking can help with benchmarking by providing a clear understanding of the current status of the project, including the status of all trade and any related delays or setbacks. This data can then be used to compare the project’s progress against similar projects or industry standards, making it easier to identify areas where improvements can be made.
With multiple sources of information on a single project, a digital progress tracking tool can deliver accurate data to one shared source of truth, making benchmarking markedly easier.
Additionally, progress tracking stored data can be leveraged for benchmarking future progress against previous internal projects for better forecasting future project and completion dates, as well as for identifying potential cost savings or other opportunities to optimize the project.
The more detailed information teams have on the progress of a project, the more proactive they can be to keep it on track. Identifying potential issues early on allows for corrective action to be taken sooner rather than later, reducing hours, rework, and delays to deliver projects on time and on budget. But detailed and timely progress tracking shouldn’t come at the cost of crews’ time and resources.
That’s where a solution like Doxel’s automated progress tracking can help. Doxel significantly reduces hours tracking progress, while delivering accurate, reliable objective insights that improve communication and transparency across all stakeholders.
Click here to learn more about how Doxel’s AI-powered progress tracking paired with 360-degree video capture can help ensure hospital construction projects stay on track and on budget.
Healthcare construction teams that leverage AI-powered performance monitoring are armed with accurate data in near real-time to keep projects on track.
Healthcare construction is a specialized niche in the industry, and the projects within it require a high standard of attention to detail to meet their deadlines. These projects are complex and involve the coordination of large, cross-functional teams to complete them on tight schedules—which means a project’s success is majorly dependent on the efficiency and collaboration of the team building it.
Every day that the facility is delayed or past schedule means another day patients can’t come in, and the owner or company will lose money.
Enter, AI-powered project controls – automated construction progress tracking.
The construction of healthcare projects is a delicate balance of innovation and realism. As one of the more technology-driven sectors, these facilities aim to have the latest and greatest equipment, but at the same time needs to be planned months in advance and available within a certain deadline. Teams must stay on top of an ever-changing landscape and varying demands—so having accurate, objective project progress data throughout is essential.
One of the biggest factors to staying on schedule is knowing exactly where you are. Without a single view of project progress, sticking to a set schedule becomes a risky guessing game. Progress tracking using the power of computer vision enables project teams to build faster and more accurately together.
After all, knowledge is power. Teams that leverage AI-powered performance monitoring are armed with accurate data in near real time to see backwards at what’s been done, as well as ahead at predictive insights.
Rework can be a project schedule’s worst nightmare—and the later it’s caught the bigger a scheduling headache you have on your hands. Rework takes valuable time away from what should be forward progress. In order to achieve schedule predictability, a project team has to be able to spot (and avoid) potential rework on the critical path.
Using computer vision automated construction progress tracking that acts as a digital surveyor, superintendents can quickly catch any missing or incorrectly installed components before the next trade covers up the error. This foresight can help avoid weeks of delays and schedule compression, which ultimately helps the facility stay on track to open on time or earlier.
Real-time automated construction progress tracking doesn’t just help with new healthcare construction—it can also help reduce downtime during facility operations down the road.
Picture it (if you dare): A construction company closes off an area to cut into the wall and fix MEP services only to discover that it wasn’t installed per as-built plans. Instead of adhering to the plan, dreaded rework is now required.
But what if you had x-ray vision instead? Comprehensive reality capture of an as-built facility ensures maintenance teams know exactly what was installed and where, so any maintenance and retrofits can be done efficiently without the rework. Instead of costing days of downtime, teams can get in and get it done as planned the first time.
At its core, Doxel is automated construction progress tracking that provides objective, accurate data on materials installed for real-time project controls. The more teams can document in the moment, the more productive and proactive they become.
Find out how healthcare projects have used Doxel to deliver facilities earlier and at a higher standard of quality.
Doxel is thrilled to partner with Corscale in revolutionizing the landscape of data center construction, setting a new standard for the industry.
Gainesville, VA – (November, 2023) – Corscale, the exclusive data center platform of the Patrinely Group, has announced that it will be deploying Doxel, the leader in AI automated construction progress tracking to speed the pace of construction and reduce waste on upcoming data center construction.
“Corscale is focused on implementing industry leading construction and sustainability initiatives. We are committed to building efficiently. Doxel will help us accelerate construction schedules and deliver critical data centers faster.” said Nic Bustamante, Chief Technology Officer for Corscale. Prior to his current position, Nic was the Senior Vice President of Development at Corscale and held leadership roles at Apple, Google, and Microsoft.
The rise in artificial intelligence, specifically Natural Language Processing (NLP), computer vision, and machine learning, and robotics, is increasing the already strong demand for data center solutions. Corscale will now harness the power of AI to build the data centers that deliver AI.
“Doxel is thrilled to partner with Corscale in revolutionizing the landscape of data center construction. Corscale’s commitment to industry-leading initiatives aligns with Doxel’s mission to transform construction through the power of AI. We aim to enhance the efficiency and sustainability of constructing data centers, setting a new standard for the industry. This collaboration represents a significant stride toward the future, where AI not only powers data centers but also drives their seamless and sustainable construction.” – Saurabh Ladha, CEO of Doxel.
The partnership with Doxel reflects Corscale’s forward-thinking approach to stay at the forefront of technological advancements. By incorporating AI into the construction process, Corscale not only meets the rising demand for data center solutions but also pioneers a path toward intelligent, sustainable, and swift data center deployment.
Corscale Data Centers is focused on delivering sustainability at scale. As the exclusive data center platform of the Patrinely Group, Corscale, together with its capital partner USAA Real Estate is delivering tomorrow’s data center, today. The company has assembled a top-tier team of industry professionals who bring decades of experience designing, building, and operating sustainable, high-density data centers for some of the largest and most sophisticated hyperscale operators and enterprises. Corscale delivers highly scalable, secure, and energy-efficient build-to-suit powered shells as well as flexible modular deployments. To learn more, please visit Corscale.
Doxel is focused on speeding up construction and reducing waste by using AI to automate progress tracking. Doxel believes in the power of aligned teams and designed Doxel to unlock their full potential. With Doxel, owners have full observability on their site while providing their field teams with powerful tools that prevent delays, over-billing, re-work, and trade stacking. Backed by Insight Partners, Amplo, and Andreessen Horowitz and with a growing team of engineers, scientists and construction veterans, Doxel is driven to help their customers win.
For media inquiries, please contact:
Corscale Media Relations
press@doxel.ai
Doxel Media Relations
press@doxel.ai
Accurate, reliable data allows construction companies to remove subjectivity and replace it with objective accountability.
Communication can make or break a construction project. A report from the Project Management Institute found that ineffective communication was the main contributor to project failure one-third of the time. An even more alarming finding from the research is that 56% of budgets allocated to projects are at risk due to poor communication.
Without objective insights alignment among field and office teams, knowing what’s happening on a project becomes a daunting task—one that could put a project (and its profitability) at risk.
1. Delayed communication
Timely communication (especially between the field and the office) is hard to achieve. Field teams are focused on a hundred different things at once, and relaying project updates typically happens at the end of their day. Because field leaders aren’t able to instantly communicate every facet of a project’s progress as it happens, there is a lag time and gap in each day’s reporting.
2. Inconsistent communication
In addition to being delayed, communication from the field to the office isn’t always consistent. The more variables and people added to the equation, the more potential for confusion and uncertainty. Communication on a project can very quickly turn into a game of telephone—and teams are forced to hold more meetings and conversations to ensure mutual understanding.
3. Missing communication
While delayed and inconsistent communication can hold a project back, missing communication can halt it entirely. If proper communication isn’t happening, neither is profitable building.
All these challenges in communication don’t just create extra stress and work on a project—they can have a deeper impact on the data and tracking, too. Without everyone on the same page, the reporting and insights are left to everyone’s individual perspective. As a result, the project’s insights suffer.
Accurate, reliable data allows construction companies to remove subjectivity and replace it with objective accountability. Insights that are trackable and consistent bring everyone together on the same page to make informed decisions, faster.
Improve communication and progress tracking
Streamline billing and accountability
The key to collecting reliable insights is through automated progress tracking. The right tool can increase team alignment and communication, without adding effort to the project team’s plate.
Doxel brings predictability to construction projects by providing critical insight with objective analytics. The AI-powered computer vision builds a digital twin of the jobsite on a weekly basis—providing true progress reporting and near real-time data. Doxel acts as a digital surveyor to capture and quantify project progress and eliminates the need for teams to manually calculate and report on it. The result is detailed, shared progress tracking from a single source across every project stakeholder and subcontractor.
Strategies for maintaining a healthy work-life balance.
Doxel CEO Saurabh Ladha is featured on The QTS Experience Podcast with David McCall. David and Saurabh discuss the impact of waste and rework in construction.
Saurabh discusses how Doxel integrates AI with established processes to build faster. Join us for the conversation, on the next QTS Experience. Episode 191; Saurabh Ladha: Intuitive Construction, AI, Doxel, Innovation, Data Center.

Doxel is proud to sponsor DCD Connect London 2026, joining Europe's leading data center owners, developers, contractors, engineering firms, and technology providers to explore the future of AI-powered data center construction.
Europe's data center market is entering a new phase of growth. AI infrastructure, power availability, sustainability mandates, and gigawatt-scale developments are reshaping how projects are planned and delivered, and owners and contractors need greater visibility into performance to keep pace.
Doxel is sponsoring DCD Connect London 2026, joining Europe's leading data center owners, developers, contractors, engineering firms, and technology providers for two days of industry insight and collaboration. Held September 16–17 at the Business Design Centre in London, the event brings together more than 5,000 industry leaders, 150+ exhibitors, and 280+ speakers shaping the future of digital infrastructure.
Data center development is expanding beyond traditional FLAP-D markets into the Nordics, Mediterranean, and Eastern Europe, even as developers navigate grid constraints, evolving sustainability regulations, labor shortages, and increasingly aggressive delivery schedules. In this environment, accurate progress tracking and early risk identification aren't optional; they're what keep gigawatt-scale programs on schedule.
Doxel replaces manual reporting with automated progress tracking to keep teams aligned with hard facts that leave no ambiguity on where the project is today, where it will be tomorrow, and what decisions need to be made to land it on schedule and on budget. With Doxel, construction professionals have full observability on their site while providing their field teams with the powerful tools they need to prevent delays, over-billing, rework, and trade stacking.
Visit Doxel to see how leading project teams use AI to:
Whether you're delivering a single hyperscale facility or managing a multi-campus portfolio, Doxel gives you the construction intelligence to reduce uncertainty and improve outcomes.
Event Information
Event: DCD Connect London 2026
Dates: September 16–17, 2026
Location: Business Design Centre, Islington, London, UK
Book a meeting with the Doxel team at DCD Connect London to see how AI-powered progress tracking is helping Europe's data center builders deliver with greater confidence and control.

Doxel is heading to DCAC USA 2026 on August 24-26 at the Austin City Limits Live, Moody Theater. Come see us on “The Porch” on August 24th-26th.
Known as “The People’s Conference,” DCAC USA has become one of the most respected operator- and builder-focused gatherings in the data center industry. As a Gold Partner, Doxel will join data center owners, operators, engineers, contractors, and delivery leaders for candid discussions around the realities of building critical infrastructure at scale.
DCAC USA brings together the industry's top owners, developers, contractors, and technology innovators for three days of networking, collaboration, and conversations driving the future of mission-critical construction.
As AI infrastructure expands, project teams need better visibility and more reliable ways to deliver increasingly complex construction programs. Doxel's AI-powered Work-in-Place (WIP) tracking and schedule analytics provide an objective view of construction progress, helping teams identify risks earlier, improve coordination, and make faster, more informed decisions.re using AI to:
The next challenge in data center construction isn't building one project. It's building the next project more efficiently than the last.
Doxel is excited to attend the Data Center Investment Conference & Expo (DICE): South, where data center developers, owners, contractors, and technology leaders will explore the strategies shaping the next generation of AI infrastructure.
Texas continues to lead the nation's data center expansion, fueled by unprecedented AI demand and billions of dollars in new investment. Recent announcements include major financing for new Texas campuses and hundreds of planned projects across the state, reinforcing the region's position as one of the world's fastest-growing data center markets.
Delivery at Scale: How to Move From One-Off Wins to a Repeatable System

Panelists:
Location: Dallas, Texas
Dates: Wednesday, Aug 12-13, 2026
Event Page
As AI infrastructure expands from single facilities to multi-campus programs, contractors must deliver consistent results despite labor shortages and increasingly aggressive schedules. John Rewolinski will join industry leaders to discuss practical strategies for building repeatable delivery systems that improve project performance at scale.
Doxel's AI-powered Work-in-Place (WIP) tracking and schedule analytics give teams objective, real-time visibility into construction progress, helping them identify risks sooner, improve coordination, and make faster decisions.
Visit Doxel at DICE South to see how leading data center builders are using AI to:
Learn how Doxel is helping data center teams deliver faster, with greater confidence and consistency.

Doxel is heading to DCAC Europe 2026 on June 23–24 at The Roundhouse in London. See us on "The Balcony" during the event on June 24.
Known as “The People’s Conference,” DCAC Europe has become one of the most respected operator and builder-focused gatherings in the data center industry. The event brings together owners, operators, engineers, contractors, and delivery leaders for candid discussions around the realities of building critical infrastructure at scale.
Unlike larger corporate trade shows, DCAC Europe is intentionally designed around community, practical conversations, and operational insight. The event consistently attracts the people directly responsible for solving some of the industry’s most challenging problems.
“We are in the middle of the fastest industrial shift in human history — the 5th Industrial Revolution. AI, compute, power, labor, land, capital, and community trust are colliding in real time, yet the world still fundamentally misunderstands the sector making it all possible.
Data centers are not background infrastructure. They are the front line of the AI era. That disconnect is no longer just frustrating. It is actively dangerous.
Misconceptions around our industry are slowing workforce development, delaying policy clarity, impacting community trust, and creating friction across project execution and capital deployment. This year, DCAC is focused on confronting that narrative head-on.” - DCAC Team
DCAC Europe brings together the people responsible for building and operating some of the world’s most complex data center projects.
That is why Doxel continues to attend year after year.
The event creates valuable opportunities to connect directly with teams focused on improving construction performance, increasing schedule certainty, reducing risk, and delivering projects faster with greater predictability.
Doxel helps owners and contractors gain objective visibility and actionable insights into construction progress through AI-powered progress tracking. By comparing field conditions against BIM models and schedules, teams can identify risk earlier, improve coordination across trades, and make faster, more informed decisions.
Instead of relying on subjective updates or delayed reporting, project teams gain measurable visibility into actual production progress across the jobsite. This allows teams to understand what is truly complete, what is falling behind plan, and where intervention may be needed before delays compound.
On major projects, Doxel has helped teams move beyond subjective “rule of thumb” tracking toward objective production benchmarking and real-time operational insight.
This level of visibility becomes increasingly important on fast-moving data center projects where even small coordination issues can create cascading schedule impacts across multiple trades and work areas.

Representing Doxel at the event includes Faiz Alidina, Director of Sales, EMEA, Ken Denning, David Brody, Hamza Abukar, and Dom Pound-Palmieri.
Doxel will also participate in the networking and community events surrounding DCAC Europe, including the DCAC Charity Golf event on June 23 at Sudbury Golf Club.
If you are attending DCAC Europe 2026, connect with Doxel to learn how leading data center teams are improving visibility, predictability, and execution certainty across complex construction programs.
Event website: DCAC Europe 2026
From June 2–4, Doxel will join thousands of leaders across the global data center ecosystem at the 2026 Datacloud Global Congress (DGC) 2026 in Cannes, France.
Held at the iconic Palais des Festivals et des Congrès, Datacloud Cannes brings together hyperscalers, developers, investors, operators, and construction leaders shaping the future of AI infrastructure and digital capacity expansion.
With more than 6,000 attendees expected, this year’s event arrives at a critical moment for the industry. AI demand continues to accelerate the construction of data centers globally, while labor shortages, power constraints, and schedule pressures continue to intensify.
As a Silver Sponsor, Doxel will be exhibiting at Booth #317 with full EMEA sales, product, and customer coverage on site, including participation in the event’s pre-conference cycling activities.
The conversations at DGC align directly with the challenges Doxel helps solve every day on large-scale projects.
Across the industry, owners and builders face mounting pressure to deliver complex facilities faster while maintaining quality and reducing risk. At the same time, construction productivity continues to lag behind other industries despite increasing project complexity and demand. For data center teams building hyperscale campuses and AI infrastructure, delays and missed coordination windows can quickly create cascading schedule impacts.
That is why objective, real-time construction visibility has become increasingly important.
Throughout Cannes, Doxel will showcase how leading owners and contractors are using AI-powered progress tracking to improve schedule certainty, benchmark production, and reduce costly surprises in the field.
Doxel automatically captures and analyzes site progress against BIM models and schedules, giving teams real-time visibility into what is actually happening on site. The platform eliminates the delays and inconsistencies that come from manual reporting and subjective progress tracking.
On major projects, Doxel has helped teams move beyond “rule of thumb” project management by introducing objective production benchmarking and real-time performance insights. DPR Construction used Doxel to improve benchmarking consistency and increase confidence in decision-making across projects.
As owners demand greater predictability and transparency across capital programs, Doxel gives teams what traditional reporting systems often cannot: a live operational view of project execution.
To support our efforts at Datacloud Cannes, we are launching a digital billboard campaign across key areas surrounding the Palais des Festivals and La Croisette.
The campaign reinforces a core message increasingly resonating across the data center market:
You cannot accelerate delivery without objective visibility into production.
The creative highlights our ability to help owners and builders deliver construction faster through automated progress tracking, real-time production insights, and proactive risk detection.
The campaign also reflects a broader shift happening across construction. Owners are beginning to manage construction investments with the same operational rigor applied across the rest of their business.
Attendees can meet with our team throughout the event to discuss how AI-powered construction analytics are helping data center teams improve execution certainty at scale.

If you are attending Datacloud Cannes 2026, stop by Booth #317 to see how we’re helping teams deliver complex projects with greater speed, visibility, and confidence.

Doxel is attending DCD>Connect APAC 2026 in Bali to discuss AI infrastructure, data center construction visibility, and reducing delivery risk across fast-growing APAC markets.
Doxel is heading to on June 9–11 at the Grand Hyatt Bali to participate in DCD>Connect APAC 2026
As AI infrastructure demand accelerates across Asia-Pacific, developers, operators, and construction teams are under increasing pressure to deliver capacity faster while managing growing project complexity.
APAC has quickly become one of the world’s most active regions for data center expansion. Markets across Southeast Asia, Australia, and India continue to see rapid investment from hyperscalers, colocation providers, and digital infrastructure firms racing to support AI workloads and cloud growth.
At the same time, the challenges facing project teams continue to intensify.
Data center facilities are becoming larger, denser, and more complex. Regional supply chains remain fragmented. Skilled labor availability varies significantly by market. Power constraints and permitting pressures are increasing in key hubs. Teams are being asked to build faster than ever before while maintaining certainty around schedule, quality, and coordination.
Industry research from McKinsey & Company shows that global construction productivity has remained largely stagnant for decades despite increasing project complexity and demand. The report notes that productivity in construction improved only 0.4% annually between 2000 and 2022 while labor shortages continue to worsen across major markets.
That challenge is becoming increasingly visible across APAC data center construction.
DCD>Connect APAC brings together many of the operators, developers, contractors, and infrastructure leaders shaping the future of AI and digital infrastructure across the region.
Unlike more mature markets where expansion is often constrained by existing infrastructure limitations, APAC remains heavily growth-focused. New facilities are being delivered across multiple countries simultaneously, often with compressed schedules and evolving delivery models.
This year’s event focuses heavily on the future of next-generation AI infrastructure, modular delivery strategies, localization approaches, and the operational realities of scaling hyperscale infrastructure across APAC.
For Doxel, these conversations align directly with the challenges teams are facing in the field today.
Doxel helps owners and construction teams improve visibility, coordination, and delivery performance across complex capital projects through automated progress tracking and AI-powered construction analytics.
Doxel enables teams to:
Doxel’s platform helps eliminate gaps in manual reporting by providing objective, real-time insights into what is actually happening on-site.
Companies like DPR use Doxel to improve project visibility, benchmark build speeds, and drive more objective production tracking across projects. As APAC data center projects grow larger and more complex, real-time visibility into field execution becomes critical to maintaining schedule certainty and reducing delivery risk.

Doxel’s APAC Client Manager, Sridhar Rengasamy, will be attending throughout the event and meeting with owners, operators, developers, and delivery teams across the region.
Sridhar has worked on large-scale infrastructure and capital projects across Southeast Asia totaling up to $550M in value, partnering closely with contractors and consultants to improve coordination, strengthen execution, and mitigate delivery risk across complex multi-stakeholder environments.
If you’re attending and want to discuss live or upcoming APAC projects, connect with the Doxel team during the event. To schedule a meeting, please reach out to Sridhar on LinkedIn.

Addressing Workforce Constraints in Data Center Construction
The Data Center Investment Conference and Expo (DICE): National brings together owners, operators, and builders at a time when data center demand continues to rise while the available workforce remains constrained.
Industry research shows that construction productivity has improved only modestly over the past two decades, even as project complexity has increased and labor availability has tightened. For teams delivering large-scale data center projects, this creates pressure on schedules, coordination, and overall execution.
Doxel is excited to attend DICE National, joining industry leaders as they share how teams are approaching these challenges in real project environments.
May 12–14, 2026
Day 1 Session | 2:10 PM – 2:50 PM
The panel includes perspectives from owners and operators who are directly responsible for delivering complex infrastructure programs.
The discussion will focus on how organizations are adapting to workforce constraints while maintaining delivery timelines and quality standards. Key topics include:
These challenges are not isolated to hiring. They affect how projects are planned, tracked, and executed from day one.
Doxel approaches workforce constraints as an execution and visibility challenge. When labor availability is limited, improving how work is tracked and managed becomes critical.
Doxel provides:
On data center projects with partners such as DPR Construction, this approach has supported a shift toward more consistent, data-driven benchmarking and improved confidence in project decision-making.
Data center projects require precise coordination, tight schedules, and rigorous quality control. Workforce limitations increase the risk of delays, rework, and misalignment between teams.
Improving visibility into project progress allows teams to:
This level of visibility helps teams maintain performance even when labor conditions are challenging.
This session will provide practical insights from industry leaders managing workforce constraints on active projects.
For owners, developers, and contractors involved in data center construction, it offers a clear view into how execution strategies are evolving.

Where Speed Meets Precision in Data Center Construction
The pace of data center construction has changed.
Schedules are tighter. Labor is harder to find. And the tolerance for error is almost zero. Owners and builders are being asked to deliver faster than ever, often on projects where even a small delay can cascade into millions in lost revenue.
That’s exactly why Doxel is heading to the DICE Pacific Northwest Data Center Investment Conference & Expo.
This event brings together the investors, developers, contractors, and technology leaders shaping the next generation of digital infrastructure. And this year, one topic is rising above the rest: How do you build faster without losing control?
The demand for data centers continues to surge, but the industry’s ability to deliver them has not kept pace.
Global construction productivity has barely moved over the last two decades, increasing just 0.4% annually, even as project complexity has grown dramatically
At the same time:
The result is a widening gap between what needs to be built and what can be delivered.
To close that gap, leading teams are rethinking how projects are executed. They are combining modular construction strategies with real-time, objective visibility into progress.

Speaker: John Rewolinski, PSP, Head of Scheduling Analytics, Doxel
Session Title: Speed Meets Precision: How Modular Delivery and Construction Tech Are Redefining Data Center Execution
This session focuses on a simple but critical challenge: Speed alone is not enough. Precision is what keeps speed from turning into rework.
Attendees will learn:
Most construction teams still rely on a familiar process:
The issue is not effort. It’s timing. By the time a deviation shows up in a report, it’s often weeks old. On a data center project, that delay can mean:
Doxel changes that dynamic by delivering objective, automated progress tracking that compares actual site conditions directly to the BIM model and schedule.
Instead of asking what’s happening, teams can see it.
Doxel was built for complex, fast-paced projects where precision matters.
With Doxel, teams can:
This approach eliminates manual reporting gaps and gives teams a consistent, accurate view of the jobsite
The impact is clear:
Construction is not getting simpler. But it is becoming more measurable.
With the right combination of modular delivery, AI-driven insights, and objective progress tracking, teams can finally deliver projects at the speed the market demands without sacrificing quality or control.
Doxel is helping lead that shift. See Doxel today.