Identify and Recover Delays
A project manager leveraged Doxel’s production rate tracking to uncover a three-week delay in critical-path cleanroom piping installation—despite manual reports indicating it was on track. With real-time insights, the field team successfully justified increasing crew size, recovering lost time, and ensuring the semiconductor fab met its strict commissioning schedule.
Prevent Schedule Disruptions in Semiconductor Facilities
A project manager used Doxel’s real-time progress tracking to confirm that subfab structural supports had not been installed—despite reports stating otherwise. Catching this issue before tool install and electrical integration prevented a two-week rework delay, keeping the high-precision semiconductor facility on track for operational readiness.
Optimize Trade Productivity in Semiconductor Construction
With Doxel’s real-time zone tracking, electrical and mechanical trades gained immediate visibility into which cleanroom and subfab areas were ready for work. This enabled better task sequencing and prevented trade stacking in restricted-access zones. Even amid skilled labor shortages, the team stayed on schedule, ensuring seamless tool installation and an on-time facility launch.